- C-1: SPT correction chain (N to (N₁)₆₀ for all borings)
- C-2: Bearing capacity calculations (one subsection per structure)
- C-3: Settlement calculations (one subsection per structure or segment)
- C-4: Slope stability analysis output (FOS summary sheet + SLOPE/W or SLIDE input/output)
- C-5: Seismic / liquefaction calculations (CSR, CRR, FS_L by boring)
- C-6: Pavement/subgrade design (SN equation, CBR, frost if applicable)
- C-7: Ground improvement design (if applicable)
- C-8: Pile capacity calculations (static + WEAP/CAPWAP if applicable)
- C-9: Earth pressure / retaining wall calculations (if applicable)
Each calculation subsection must show:
- Design basis (which loads, which parameters, from which section/table)
- All equations written out (not coded into a black-box spreadsheet)
- Intermediate results clearly labeled with units
- Final result clearly highlighted
- Reference to applicable figure, section, or standard
Owner railroads: may require MathCAD Prime or formula-visible Excel for all calculations rather than PDF-only packages.
Passenger railroads: may require a separate independent design check by a second PE for all passenger corridor foundation and retaining wall calculations.
Empirical equation note · this section
Values from these correlations are estimates, not test results. State the equation ID and source when one is used, confirm the soil or rock is within its range, and calibrate against site testing before design.
- IS-02 SPT overburden normalization (sands) (N₁)₆₀Use: Cohesionless soils; normalizes to σ'v0 = 1 atm. Cap of 1.7 recommended by NCEER workshop. Limits: Not applicable to clays. Unreliable at σ'v0 > ~4,200 psf, about 2 tsf (other CN forms preferred at depth).