7.4.3 Deterioration and Triggers

Treating the cuts and embankments of a railroad as an asset portfolio: inventory, condition, deterioration, prioritization and the choice of remedial works.
Author: Daniel P. Colwell
7.4.3 Deterioration and Triggers

Earthworks deteriorate in characteristic ways: cut slopes in weak rock and clay soften and flatten over decades; embankments of clay fill lose strength as seasonal wetting and drying opens fissures; ditches fill and culverts corrode; vegetation changes. Many failures, however, are not gradual but triggered: by intense or prolonged rainfall, by rising rivers, by changes made at the toe (ditch cleaning, excavation) or at the crest (loading, drainage changes). An asset program therefore needs two parts: a cyclic program addressing deterioration, and an event-driven program (inspection after storms, live risk rating) addressing triggers (Chapter 3.8).

← Previous · 7.0 Design Chapter 7.3 — Pavement Subgrade Evaluation
Next · 8.0 Reporting → Chapter 8.1 — Exploration Versus Investigation