The inventory divides the corridor into discrete earthwork assets and records the basic facts about each.
| Item | Content |
|---|---|
| Identification | Asset ID, line segment, mileposts, track(s), side |
| Type | Cut, embankment, sidehill (cut and fill), at-grade, retained |
| Geometry | Height or depth, slope angles, length, benches |
| Materials | Soil and rock types, fill type (Chapter 2.10), problem soils present |
| Drainage | Ditches, culverts, subdrains, outfalls and their condition |
| Hazards | Mapped hazards from the desktop study: landslide, rockfall, karst, mining, flooding, scour |
| History | Past failures, repairs, speed restrictions, maintenance frequency |
| Consequence factors | Traffic, speed, hazardous materials, passenger service, detour length, adjacent property |
LiDAR, aerial imagery and the KMZ workflow allow most of the inventory to be built at the desk, with field verification concentrated on the higher-hazard assets (Chapter 3.2).