Each asset is examined on a cycle set by its rating, with more frequent examinations for higher ratings and after triggering events (heavy rain, floods, earthquakes, freeze-thaw). The examination records observed defects using consistent terms so that changes can be tracked.
| Defect | Indicators |
|---|---|
| Instability | Tension cracks, scarps, bulging toe, leaning trees and poles, track alignment or surface defects |
| Erosion and scour | Gullies, undercut toe, exposed culvert ends, scour at bridge approaches |
| Drainage failure | Blocked ditches and culverts, ponding, seepage on slopes, soft wet track |
| Rockfall | Fresh rock in ditch, overhangs, open joints, damaged fences or detectors |
| Settlement and subsidence | Sags, depressions, sinkholes, repeated surfacing |
| Burrowing and vegetation | Animal burrows in embankments, large trees on steep slopes, root jacking of rock |
Defect ratings from the examination combine with the geospatial hazard ratings to give the current risk, as set out in Chapter 3.8.
Unpaved access roads, maintenance roads and the ditches along them deliver sediment to streams and wetlands and, when they erode, undermine the toe of embankments and cut slopes. County stormwater programs inspect unpaved roads once a year with a simple yes/no checklist, where “yes” means action is needed and a work order follows. The items translate directly to railroad access roads and right-of-way ditches:
Typical BMPs are check dams, filter fabric in ditches, filling potholes, grassing, road scraping and grading, ditch cleaning, and turnouts that divert water off the road before it gathers speed. Each finding should record the action, the work order and the follow-up.
For railroad work: Add access roads, maintenance roads and right-of-way ditches to the earthworks inventory (Section 7.4.1) and examine them on the same annual cycle, using a checklist like this. Ditches that erode toward a fill toe or a cut slope, or that silt up and pond water against the track, are geotechnical problems as well as stormwater problems; rate them with the drainage elements of the risk rating. Keep the inspection records, since stormwater permits for the right-of-way may require them.
Source: Richland County, SC, Roadway Runoff Management Program: Unpaved Roads Annual Inspection Form Guidance. Summarized and paraphrased.