The earthworks inventory (Section 7.4.1) includes concrete and masonry structures that hold the earthworks together: culverts and their headwalls, retaining walls, wing walls, abutments and the footings of piers and signal structures. Their failure is a ground hazard even when the cause is the concrete, because a collapsed culvert or a failed wall takes the embankment with it. This section covers how concrete in these structures deteriorates, how to assess it, and the repair choices, drawing on the proceedings of the 2nd International Conference on Concrete Repair, Rehabilitation and Retrofitting (Cape Town, 2008).
The economics are summarized by de Sitter’s “rule of fives”, quoted by Walraven (2009): if maintenance is skipped, the later repair costs about five times the maintenance saved; if repair is skipped, renewal costs about five times the repair saved. Early condition assessment and timely repair are therefore part of the risk reduction in Chapter 3.8, not an optional extra.
Critical chloride content. Angst and Vennesland (2009) reviewed about 40 studies of the chloride content at which steel starts to corrode. Reported values ranged from 0.02% to 3.08% chloride by weight of cement, so no single threshold exists; the steel–concrete interface, the pH of the pore water and the electrochemical potential of the steel all control it. In practice, owners set decision levels: on one set of marine bridges, members with more than 1% chloride by weight of cement at the steel were judged too contaminated for coatings and inhibitors and were either treated electrochemically or rebuilt (Streicher et al. 2009).
| Option | What it does | Notes for use |
|---|---|---|
| Water repellent (silane) impregnation | Keeps water and chlorides out of sound concrete | Works only if it penetrates deeply enough. Johansson et al. (2009) found that extending contact time from 1 to 5 hours (for example by using a paste or gel rather than a liquid) about doubles the depth, as do drier concrete and higher porosity. Check depth by splitting a treated core and wetting it. |
| Corrosion inhibitors | Slow corrosion of steel in contaminated concrete | Less effective at high chloride levels. |
| Patch repair | Replaces damaged concrete around the steel | Bond depends more on an undamaged substrate than on roughness. Bissonnette et al. (2009) found that jackhammering leaves a damaged surface that outweighs its extra roughness; hydrodemolition, scarifying and blasting gave better bond. Verify with pull-off tests. |
| Galvanic (sacrificial) anodes | Zinc anodes connected to the steel corrode instead of it | No power supply; typical design life about 25 years. Anode mortar dosages of roughly 0.1 lb per ft² of steel surface have been used (Bänziger et al. 2009). Can be checked during routine inspections by measuring anode current. |
| Impressed-current cathodic protection | A power supply drives protective current to the steel | Long-lived; needs monitoring and maintenance of the power supply. |
| Electrochemical chloride extraction | A temporary external anode draws chlorides out of the cover and raises the pH at the steel | Treatment over weeks; seal the surface afterward to stop new chlorides. Treated bridge members showed no new spalling or rust staining after four years (Streicher et al. 2009). |
| Realkalisation and hybrid treatments | Restore high pH at the steel | A brief impressed-current “pit realkalisation” of 1 to 2 weeks, followed by galvanic protection from the same installed anodes, arrests and then prevents corrosion (Glass et al. 2009). |
| Externally bonded FRP | Restores or adds flexural and shear strength | For walls, caps and beams; needs sound substrate and anchorage at the ends. |
| Demolish and rebuild | Removes the problem | Compare with repair options by life-cycle cost (Chapter 3.8, Section 3.8.40). |
Andrade et al. (2009) note that the efficiency of electrochemical treatments has traditionally been checked by switching off the protection current or by coring after treatment, and propose nondestructive checks (impedance, corrosion rate and potential, and the charge passed adjusted for concrete resistance). Ask for a measurable acceptance criterion in any electrochemical treatment contract.
Da Silva and Goyns (2009) assessed two deep concrete sewers under a busy street that had deteriorated in different ways: one, made with dolomitic aggregate and a sacrificial layer, had lost material evenly; the other, cast in place with siliceous aggregate, had lost cement paste and exposed its aggregate. Because open-cut replacement was ruled out, both were rehabilitated by trenchless lining with a close-fitting continuous liner, and the annular space between liner and host pipe was grouted to prevent water paths. The same reasoning applies to deep culverts under track: open-cut replacement needs a track outage and a temporary shoofly or bridge, so lining, with the annulus grouted and any voids around the pipe filled, is often the preferred choice where the remaining pipe and surrounding soil can carry the load. Check the lined culvert’s hydraulic capacity with the reduced diameter (Chapter 3.5, Section 3.5.10).
After a rainfall-triggered failure of a road cut on a mountain pass, Kruger et al. (2009) compared three repairs: an anchored pile wall with a cantilevered deck, a mechanically stabilized earth wall, and a half-width viaduct on piers. Steeply dipping, weathered and jointed rock made isolated pier footings vulnerable to block and wedge failure, and the MSE wall could have been undercut by future slides, so the anchored pile solution was chosen: eight 4-ft-diameter bored piles at about 26-ft centers, about 46 ft long and socketed about 13 ft into competent rock, carrying a 200-ft-long cantilevered deck balanced by a buried slab, with re-stressable rock anchors and the slab bolted down to rock. A temporary soil-nail wall kept traffic moving during construction.
For railroad work: the same logic applies to a sidehill grade that has lost its outer shoulder: where the rock structure dips out of the slope, prefer continuous anchored piles socketed into rock over isolated footings or a reinforced fill that could be undercut (Chapter 7.1, Section 7.1.4; Chapter 6.3). Use re-stressable anchors so that load can be checked and restored during the structure’s life.
Papers in Alexander, M. G., Beushausen, H.-D., Dehn, F. and Moyo, P. (eds.) (2009). Concrete Repair, Rehabilitation and Retrofitting II. Proceedings of the 2nd International Conference on Concrete Repair, Rehabilitation and Retrofitting (ICCRRR), Cape Town, 2008. London: CRC Press/Balkema. Summaries are paraphrased and values converted to English units.