Related chapters in this manual:
Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.
Photograph credits
The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.
- Photo 2.11.6-1 — Air percussion rig installing grout pipe on site. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
- Photo 2.11.6-2 — Grout is placed in the hopper of the pump. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
- Photo 2.11.6-3 — A grout pump with lines running to grout pipes. The silty sand material used in the grout mix can be seen in the background. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
- Photo 2.11.6-4 — Paddles in the hopper of the grout pump thoroughly mix the grout materials. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
- Photo 2.11.6-5 — Grout lines run from the pump to the casing installed in the ground. The casing is held in place by a hydraulic jack. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.