↑ Parent Menu⌂ Main Menu
← Chapter 2.11 Soluble Ground and Karst: Sinkholes, Voids and Dissolution
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.11.4 Finding Karst: Geophysics and Drilling

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.
Author: Daniel P. Colwell
2.11.4 Finding Karst: Geophysics and Drilling

Because the features are small, the chance that a boring grid hits a given void is low. For a circular void of diameter D and a square boring grid of spacing S, with D smaller than S:

P ≈ π D2 / (4 S2)(Eq. 2.11-1)
Approximate probability that a single randomly located void is hit by a boring in the grid.

A 10-ft void under a 50-ft grid has about a 3% chance of being hit. This is why geophysics comes first. Electrical resistivity imaging (ERI) and multichannel analysis of surface waves (MASW) are the most widely used methods for mapping the rock surface and soil-filled zones; microgravity finds air-filled voids; ground-penetrating radar works in sandy cover but not in clay. Borings then target the anomalies and a few control points.

Table 2.11-3. Methods for karst investigation
MethodFindsLimitations
Electrical resistivity imagingRock surface, clay-filled slots, wet raveled zonesResolution falls with depth; needs ground contact
MASW / seismicSoft zones and rock surfaceLower lateral resolution
MicrogravityAir-filled voidsSlow; sensitive to terrain and nearby mass
Ground-penetrating radarShallow voids and raveled zones in sandy coverLittle penetration in clay
Borings with rock coringConfirms rock, voids, infill; loss of circulation and rod drops are key observationsPoint data; low chance of hitting voids
Probe holes (air track)Rapid check of rock surface and voids on a tight gridNo samples

In borings, log rod drops, loss of drilling fluid, soft or very soft soil just above rock and sudden changes in rock depth. These observations are often more valuable than the samples themselves (Chapter 4.1).

← Previous · 2.0 The Underworld Chapter 2.10 — Non-Engineered Fills: Old Embankments, Waste and Made Ground
Next · 2.0 The Underworld → Chapter 2.12 — Sulfates, Sulfides and Problem Mudrocks