Karst is the landscape that forms on soluble rock. Its features include sinkholes, sinking streams, springs, caves, pinnacled rock surfaces and soil-filled slots. For railroads, karst matters because it causes sudden, local loss of support under track, often after a change in water: a new culvert outfall, a broken water main, a ditch that now discharges into a sinkhole, drawdown from a quarry or well field, or an intense storm.
The governing difficulty is that karst features are small compared with the spacing of any practical boring program, and the rock surface can vary by tens of feet across a few feet horizontally. A site can be explored with a dozen borings that miss every void. The investigation therefore relies on desktop study and geophysics to find anomalies, and on borings to confirm them.