↑ Parent Menu⌂ Main Menu
← Chapter 2.11 Soluble Ground and Karst: Sinkholes, Voids and Dissolution
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.11.3 Finding Karst: Desktop Study and Reconnaissance

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.
Author: Daniel P. Colwell
2.11.3 Finding Karst: Desktop Study and Reconnaissance
  • State geological survey karst and sinkhole maps, and karst layers in the Earth Viewer.
  • LiDAR bare-earth hillshade and closed-depression analysis: sinkholes stand out as closed contours that no stream drains.
  • Historical aerial photographs: new depressions, ponds that appear and drain, circular vegetation changes.
  • Track maintenance records: repeated surfacing at the same spot, especially after storms, is a classic karst signal.
  • Field reconnaissance: depressions, swallets where ditches disappear, leaning fence posts and poles, cracked ditch linings, springs at the toe of slopes.

These sources are free and fast, and they should be finished before any geophysics or drilling is scoped (Chapter 3.2).

← Previous · 2.0 The Underworld Chapter 2.10 — Non-Engineered Fills: Old Embankments, Waste and Made Ground
Next · 2.0 The Underworld → Chapter 2.12 — Sulfates, Sulfides and Problem Mudrocks