A karst risk rating combines the geology (is the rock soluble, and how deep), evidence of activity (existing sinkholes, maintenance history) and triggers (concentrated water, drawdown).
| Rating | Geology and evidence | Triggers |
|---|---|---|
| 1 Very low | Non-soluble rock, or soluble rock under more than 100 ft of cover | None |
| 2 Low | Soluble rock mapped; no sinkholes within 1/4 mile | Normal drainage |
| 3 Moderate | Sinkholes mapped within 1/4 mile; pinnacled rock in borings | Culverts or ditches discharging toward karst |
| 4 High | Sinkholes within 500 ft; past subsidence at or near the track | Concentrated discharge into ground; nearby pumping or quarrying |
| 5 Severe | Active depression or void under track; gypsum or salt with fresh water reaching it | Ongoing; recent storm or water main break |
Karst is a natural candidate for the live risk rating described in Chapter 3.8: rainfall intensity and water levels in nearby wells are measurable triggers that raise the likelihood of collapse for a known susceptible site.