| Rock | Relative solubility | Engineering significance |
|---|---|---|
| Limestone, dolomite, marble (carbonates) | Slow; features form over thousands of years | Voids and sinkholes form mainly by soil raveling into existing openings; rock voids change little in a structure's life |
| Gypsum and anhydrite | Roughly 100 times faster than limestone | New voids can form within a structure's life where flowing water reaches the rock; anhydrite swells as it hydrates |
| Rock salt (halite) | Very fast | Rapid subsidence where fresh water reaches salt, often from wells, mines or brine extraction |
Gypsum and salt are the dangerous cases because dissolution can be fast enough to matter during the service life of an embankment or bridge. A drainage change that sends fresh water into gypsum-bearing ground should be treated as a potential new trigger.