| Type | Mechanism | Speed | Railroad significance |
|---|---|---|---|
| Solution (dissolution) | Gradual lowering of the rock surface where water concentrates | Very slow | Shallow depressions; drainage problems |
| Cover-subsidence | Sandy cover gradually ravels into openings, forming a bowl | Slow, months to years | Progressive settlement; detectable by survey |
| Cover-collapse | Clayey cover arches over a growing void until the arch fails | Sudden, minutes to hours | The main hazard: abrupt loss of support under track |
| Caprock (bedrock) collapse | Roof of a cave collapses | Sudden | Rare at shallow depth; important for bridges and deep cuts |
| Buried (filled) sinkhole | An old sinkhole filled with soft soil | Static until loaded or wetted | Differential settlement and soft pockets; often found during construction |
Most sinkholes that affect railroads are cover-collapse or cover-subsidence sinkholes induced by concentrated water: the soil is washed down into the rock openings from above (raveling), or a falling water table removes buoyant support from the soil arch. Both are driven by human changes to drainage far more often than by natural processes alone.