2.11.7 Worked Example

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.
Author: Daniel P. Colwell
2.11.7 Worked Example
The example uses a generic site and is not taken from any client project. It follows the five-part format.
Example 2.11-1: Boring Detection Probability and Grout Quantity in Karst

A siding is to be built over limestone with mapped sinkholes nearby. The first proposal is a 50-ft boring grid. Resistivity later shows a raveled zone 40 ft long and 30 ft wide extending 12 ft above rock, and borings in the zone indicate about 15% voids and very soft soil that will take grout.

Given

VariableValueDescription
D10 ftTypical void (throat) diameter assumed
S50 ft, then 25 ftBoring grid spacings considered
L × B × T40 ft × 30 ft × 12 ftRaveled zone from resistivity and borings
nv0.15Estimated void and very soft fraction to be filled
k1.3Grout waste and travel factor

Required

  • Probability that a single 10-ft void is hit by the 50-ft and 25-ft grids
  • Estimated grout volume for the raveled zone

Equations

  1. Eq. 2.11-1: P ≈ πD2/(4S2) — chance a grid boring hits the void
  2. Eq. 2: V = L B T nv k — grout volume estimate

Steps

Step 1 · 50-ft grid
P = π(10)2 / (4 × 502) = 314 / 10,000
P ≈ 0.031, about 3%
Spot check: The void covers about 79 sq ft of each 2,500 sq ft grid cell: about 3%.
↓
Step 2 · 25-ft grid
P = 314 / (4 × 625) = 314 / 2,500
P ≈ 0.13, about 13%
Spot check: Halving the spacing quadruples the borings and the probability, which is still low.
↓
Step 3 · Grout volume
V = 40 × 30 × 12 × 0.15 × 1.3 = 2,808 cf
V ≈ 2,800 cf ≈ 104 cy
Spot check: 14,400 cf of zone × 0.15 = 2,160 cf; × 1.3 = 2,808 cf; ÷ 27 = 104 cy.
↓
Solution
A 50-ft grid has only about a 3% chance of hitting a single 10-ft void (13% at 25 ft). The raveled zone found by resistivity needs on the order of 100 cy of grout, which should be carried with a contingency.

Solution

A 50-ft grid has only about a 3% chance of hitting a single 10-ft void (13% at 25 ft). The raveled zone found by resistivity needs on the order of 100 cy of grout, which should be carried with a contingency.

Even a tight boring grid is a poor tool for finding karst voids; four times the borings raised the detection chance only from 3% to 13%. Geophysics found the raveled zone, and the borings were then placed where they could confirm it. That sequence (desktop study, geophysics, targeted borings) is the efficient way to investigate karst.

Grout takes in karst routinely exceed estimates because grout follows openings outside the target zone. Specify a refusal criterion, start with primary holes on a wide spacing and close in with secondary and tertiary holes, and carry a contingency of 50 to 100% on grout quantity in the estimate (Chapter 3.7).