2.11.6 Treatment Under Track

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.
Author: Daniel P. Colwell
2.11.6 Treatment Under Track
Table 2.11-5. Treatment of sinkholes and karst under track
MethodDescriptionUse
Drainage controlRedirect concentrated water away from karst; line ditches; avoid discharging culverts into sinkholesAlways; often the most effective measure
Inverted filter repairExcavate to rock throat, plug with large stone and concrete, then graded filter and compacted clay capIndividual sinkholes accessible from the surface
Compaction groutingLow-slump grout injected to densify raveled soil and fill voids above rockUnder operating track; limits ground loss
Cap (cavity) groutingFlowable grout injected at the rock surface to seal the throats feeding ravelingLarge areas of pinnacled rock
Geosynthetic bridgingHigh-strength geogrid or geotextile layer under the track to span a future void and give warning by saggingLong lengths where voids cannot all be found
Structural bridgingSlab or short span over a known voidSevere, localized cases
Air percussion rig installing grout pipe on site
Photo 2.11.6-1. Air percussion rig installing grout pipe on site. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout being placed in the hopper of the pump
Photo 2.11.6-2. Grout is placed in the hopper of the pump. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout pump with lines running to grout pipes
Photo 2.11.6-3. A grout pump with lines running to grout pipes. The silty sand material used in the grout mix can be seen in the background. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Paddles in the hopper mixing grout materials
Photo 2.11.6-4. Paddles in the hopper of the grout pump thoroughly mix the grout materials. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout lines running from the pump to the casing, held by a hydraulic jack
Photo 2.11.6-5. Grout lines run from the pump to the casing installed in the ground. The casing is held in place by a hydraulic jack. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.

Grouting methods are described in Chapter 7.2. Grout volumes in karst are notoriously hard to predict; a refusal criterion (pressure and take) and a contingency in the estimate are essential.