↑ Parent Menu⌂ Main Menu
← Chapter 2.9 Collapsible Soils: Identification, Testing and Railroad Impacts
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

2.9.9 Cross-References

Dry, low-density soils that hold their shape until they get wet, then lose volume suddenly under the load they already carry.
Author: Daniel P. Colwell
2.9.9 Cross-References
← Previous · 2.0 The Underworld Chapter 2.8 — Groundwater Characterization and Seepage
Next · 2.0 The Underworld → Chapter 2.10 — Non-Engineered Fills: Old Embankments, Waste and Made Ground