In the field, suspect collapse when several of these are seen together:
- Low dry density, typically below about 90 pcf for silts and 100 pcf for sandy soils, with pinhole voids or root holes visible in a cut face.
- Near-vertical cuts that stand for years but slake and slump quickly where water runs over them.
- High SPT blow counts in dry soil that drop sharply below the water table or in wet borings, and drilling fluid lost into the formation.
- Settlement concentrated around culverts, ditch inlets, ponds and other places water collects, with tension cracks parallel to the track.
- Piping holes and small sinks in fine soils on the face of an embankment or cut (also a sign of dispersive soil; see Chapter 2.5).
- Track geometry defects that recur at the same culvert or drainage feature after wet periods rather than after heavy traffic.
A hand penetrometer or pocket vane reading taken on a dry block and again after the block is soaked for an hour is a cheap field indicator: a large drop in strength on wetting points to water-sensitive bonding.