Screening criteria use index properties to decide which samples go to collapse testing. None of them predicts the amount of collapse; they flag soils that need testing.
| Indicator | Suggests collapse when | Notes |
|---|---|---|
| Gibbs criterion (Eq. 2.9-1) | wsat > LL | Best for loess and silty soils |
| Dry unit weight | γd < about 90 pcf (silts), 100 pcf (sands) | Rule of thumb only |
| Degree of saturation (Eq. 2.9-2) | S < about 60% | Natural moisture from samples sealed in the field |
| Fines content | 10 to 40% clay-size bonding fines in a silt or sand | Clean sands rarely collapse; fat clays swell instead |
| Field soak test | Large strength loss after wetting | Qualitative |
Use undisturbed samples for natural moisture and density. Split-spoon samples are disturbed and usually overstate density in loose collapsible soil; thin-walled tubes or block samples from test pits are preferred (see Chapter 4.1).