A collapsible soil is a partly saturated soil with an open structure of grains held together at their contacts by clay bridges, carbonate or salt cement, or capillary suction. While the soil stays dry those bonds carry the load. Wetting dissolves or softens the bonds, the grains slide into the open pores, and the soil compresses with no added load. The volume change is fast (hours to weeks), it is mostly irreversible, and it happens only where the water goes, so it is almost always differential.
For a railroad the importance is that wetting is usually caused by the railroad itself: a blocked ditch, a leaking or undersized culvert, a new drainage outfall, a pond formed against a new embankment, or irrigation on adjacent land. A collapsible foundation that has been stable for a century can start to move the year drainage changes. The chapter therefore treats collapse as a trigger problem as much as a soil problem.