The standard test is a one-dimensional collapse test in the oedometer (ASTM D5333, withdrawn 2012; collapse is now measured with D4546-21 for the collapse index, ASTM D4546 for one-dimensional swell or collapse). An undisturbed specimen at natural moisture is loaded in steps to a vertical stress, then flooded, and the change in height on flooding is recorded.
| Ic at 2 tsf (%) | Degree of collapse |
|---|---|
| 0 | None |
| 0.1 to 2.0 | Slight |
| 2.1 to 6.0 | Moderate |
| 6.1 to 10.0 | Moderately severe |
| > 10 | Severe |
The collapse index is a classification at a fixed stress. For design, run the test at the actual stress in the layer (overburden plus embankment and train load), or run a double oedometer test: one specimen loaded at natural moisture and one soaked first, giving the collapse strain at any stress as the difference between the two curves. Collapse strain usually rises with stress to a peak and then falls, so a test at 2 tsf can under- or over-state collapse in a shallow layer under a low embankment.