A 15-ft-high embankment on a loess terrace has developed a recurring sag over a corrugated metal culvert. Test pits beside the culvert found 8 ft of dry, light-brown silt over moist, denser silt. Block samples were taken for index and collapse testing.
| Variable | Value | Description |
|---|---|---|
| γd | 85 pcf | Natural dry unit weight of the upper silt |
| Gs | 2.68 | Specific gravity |
| LL / PI | 30 / 6 | Liquid limit and plasticity index |
| e0 | 0.95 | Initial void ratio of collapse specimen |
| e1, e2 | 0.82, 0.74 | Void ratio before and after flooding at 2 tsf |
| H | 8 ft | Thickness of collapsible silt in the wetted zone |
The silt is collapse-prone (wsat = 36% > LL = 30%), the collapse index is 4.1% (moderate), and wetting of the 8 ft zone around the culvert can produce about 4 in of settlement.
Four inches of settlement concentrated over a culvert 20 to 40 ft wide is a sharp sag, which matches the recurring geometry defect. The collapse is driven by the leaking culvert, so tamping alone will keep chasing it. The first action is to stop the water: reline or replace the culvert with watertight joints and regrade the inlet so water does not pond against the toe.
Because collapse is irreversible, soil that has already collapsed will not settle again; the remaining risk is in the dry silt beyond the wetted bulb. If the culvert is replaced by open cut, excavate the collapsible silt in the trench zone and recompact it at or slightly above optimum moisture. In the risk rating this site is a 4 (moderate collapse over a known leaking culvert) before repair and should fall to a 2 after the culvert is sealed.