Collapse needs three things: a loose, open structure; low natural moisture; and bonding that is sensitive to water. These conditions come from a small number of depositional settings, which makes the desktop study the most efficient screening tool.
| Setting | Typical soil | Bonding | Where in North America |
|---|---|---|---|
| Wind-blown (eolian) silt | Loess: ML, CL-ML | Clay coatings, carbonate | Missouri, Mississippi and Ohio valley bluffs; Palouse; central plains |
| Alluvial fans and debris flows | Silty and clayey sands, gravelly silts | Clay bridges, salts, rapid deposition | Desert Southwest, Great Basin, foothills of the Rockies |
| Colluvium | Mixed silty and clayey sand with rock fragments | Clay, low density | Foot of steep slopes in arid and semi-arid areas |
| Residual soils | Leached silty sands and sandy silts | Relict iron and clay bonds | Piedmont, some granite terrains (see Chapter 2.13) |
| Volcanic ash and pumice | Silt-size ash | Weak cement | Pacific Northwest, Intermountain West |
| Dry-placed or poorly compacted fill | Any silt or clayey sand placed dry of optimum | Suction only | Old embankments and widenings (see Chapter 2.10) |
Collapse is a function of moisture as well as soil type. A loess bluff in a wet climate may be close to saturated and no longer collapsible, while the same deposit a few hundred miles west is dry and highly collapsible. Climate maps and the natural moisture content measured in borings are as important as the geology map.