The hardest judgment is not the strain but the thickness that will actually get wet. A leaking culvert wets a bulb of soil a few feet to tens of feet across; a rising water table wets everything below it; surface ponding wets a front that advances slowly downward. Estimate a wetted zone for each credible water source and compute settlement for each, rather than assuming the whole profile wets at once. The difference between the wetted and dry zones is the differential settlement that the track will see.
Collapse settlement also adds to, rather than replaces, ordinary consolidation and creep. For new embankments on collapsible ground, check both: settlement under the new load at natural moisture, and the additional collapse if the foundation later wets (see Chapter 6.2).