Effective stress and the elastic (Boussinesq-type) solutions used to carry a surface load down to the layer being analyzed. These feed the settlement, bearing and subgrade checks.
Variables. e = void ratio; n = porosity; w = water content (decimal); S = degree of saturation (decimal); Gs = specific gravity of solids; γw = 62.4 pcf; γd, γ = dry and moist unit weight (pcf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| e | void ratio | Another equation | e = Gsγw/γd − 1, from Gs and γd; e0 for consolidation is reported by the consolidation test (ASTM D2435). | sands 0.35–0.85, clays 0.5–2.0 · by USCS group |
| n | porosity | Another equation | n = e/(1 + e), from the void ratio. | 0.25–0.55 for most mineral soils · by USCS group |
| w | water content (decimal) | Lab test | Oven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938). | gravels/sands 3–25%, clays 15–70% · by USCS group |
| S | degree of saturation (decimal) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Gs | specific gravity of solids | Lab test | Specific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested. | 2.64–2.80 mineral; lower if organic · by USCS group |
| γw | 62.4 pcf | Constant | Physical constant or standard value. | project-specific |
| γd | dry unit weight | Lab or field test | Lab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w). | sands 90–125, clays 80–115 pcf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. All soils. Exact volume–weight identities; used to get e0 for consolidation and γ for stress calculations.
Limitations. Results are only as good as Gs and w. Assume S = 1 below the water table only where the soil is truly saturated; the capillary zone and gassy organic soils may not be.
Source. Lambe & Whitman 1969 [33] [27] · In the manual: Ch 6.2 Eq. 6.2-9
Variables. σv = total vertical stress (psf); u = pore water pressure (psf); γi, hi = unit weight (pcf) and thickness (ft) of layer i; hw = depth below the water table or piezometric head above the point (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σv | total vertical stress (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| u | pore water pressure (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| hw | depth below the water table or piezometric head above the point (ft) | Field measurement | Groundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level. | project-specific |
Use. Saturated soils. Governs strength and compressibility in every chapter.
Limitations. Hydrostatic u applies only with no vertical seepage. Use measured piezometric heads under artesian or downward flow, and the seasonal high water level for design.
Source. Terzaghi 1943 [57] · In the manual: Ch 2.8 Eq. 2.8-1
Variables. c', φ' = effective cohesion (psf) and friction angle; σ'n = effective normal stress on the failure plane (psf); su = undrained shear strength (psf); subscript r = residual
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σ'n | effective normal stress on the failure plane (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| su | undrained shear strength (psf) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
Use. Long-term (drained) or end-of-construction (undrained) analyses; residual strength on pre-sheared surfaces.
Limitations. A linear envelope overstates c' at low stress; for shallow slides use c' ≈ 0 or a curved envelope. Choose drained or undrained strength by loading rate relative to drainage, not by soil name alone.
Source. Coulomb 1776; Terzaghi 1943 [16] [57] · In the manual: Ch 6.3 Eq. 6.3-12, Ch 5.2 §5.2.3
Variables. Q = point load (lb); z = depth below the load (ft); r = horizontal distance from the load line (ft); Δσz in psf
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Q | point load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| z | depth below the load (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| r | horizontal distance from the load line (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Concentrated loads (a wheel or column load) at depths greater than about twice the loaded width; superpose for several loads.
Limitations. Assumes a homogeneous, isotropic, linear-elastic half-space. Over-predicts stress below a stiff upper layer such as ballast over soft subgrade.
Source. Boussinesq 1885 [9] [45] · In the manual: Ch 6.2 §6.2.2, Ch 2.3 §2.3.2
Variables. q = uniform pressure (psf); B, L = plan dimensions of the loaded rectangle (ft); z = depth below the corner (ft). Use the arctangent in radians and add π when V < m2n2
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| q | uniform pressure (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| z | depth below the corner (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Footings, slabs and rectangular fill areas. Stress at any point is found by adding and subtracting corner rectangles; under the center of an L × B area use four rectangles of L/2 × B/2.
Limitations. Flexible load on an elastic half-space. Without the +π correction the arctangent form gives wrong values at shallow depth (V < m2n2). Iσ = 0.25 at z = 0.
Source. Newmark 1935 [41] [45] · In the manual: Ch 6.2 Eq. 6.2-1
Variables. q = uniform pressure (psf); a = radius of the loaded area (ft); z = depth below the center (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| q | uniform pressure (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| a | radius of the loaded area (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| z | depth below the center (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Tanks, plate load tests, tire or outrigger pads approximated as circles.
Limitations. Center line only; for off-center points use influence charts. Same half-space assumptions as ST-04.
Source. Integration of Boussinesq (1885) [45] [27] · In the manual: Ch 6.2 §6.2.2, Ch 7.3 §7.3.2
Variables. q = strip pressure (psf); β = angle subtended at the point by the loaded width (radians); δ = angle from the vertical to the near edge of the strip (radians, positive away from the strip)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| q | strip pressure (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| β | angle subtended at the point by the loaded width (radians) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| δ | angle from the vertical to the near edge of the strip (radians, positive away from the strip) | Lab test (or fraction of φ') | Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic). | 0.6–1.0 φ' · by USCS group |
Use. Long loads: a track bed, a wall footing or a long stockpile, where L ≥ about 5B.
Limitations. Plane strain, flexible load, elastic half-space. Confirm the sign convention for δ against the figure being used.
Source. Holl 1940; Poulos & Davis 1974 [45] · In the manual: Ch 6.2 Eq. 6.2-3
Variables. H = embankment height (ft); γfill = fill unit weight (pcf); a = horizontal length of the side slope (ft); b = half the crest width (ft); z = depth below original ground (ft); angles in radians
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| H | embankment height (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| γfill | fill unit weight (pcf) | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| a | horizontal length of the side slope (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| b | half the crest width (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| z | depth below original ground (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Railroad embankments and approach fills. For a symmetric embankment, the stress below the center line is twice the one-side value.
Limitations. Elastic half-space under a flexible trapezoidal load; ignores fill stiffness and staged construction. Use the as-built cross section when it differs from the design section.
Source. Osterberg 1957 [44] [27] · In the manual: Ch 6.2 §6.2.2, Ch 6.2 §12.11
Variables. Q = total load (lb); q = strip pressure (psf); B, L = loaded width and length (ft); z = depth below the loaded area (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Q | total load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| q | strip pressure (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| z | depth below the loaded area (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Quick checks and preliminary settlement estimates.
Limitations. Average stress only; under-predicts center-line stress at shallow depth (z < B) and should not replace ST-05 to ST-08 for final design.
Source. Approximation to Boussinesq [27] · In the manual: Ch 6.2 Eq. 6.2-2