Darcy flow, laboratory and field permeability tests, flow nets, piping and uplift, and flow to wells and drains.
Variables. k = hydraulic conductivity (ft/day); i = hydraulic gradient; A = gross flow area (ft2); v = discharge velocity; vs = seepage (pore) velocity; n = porosity
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| k | hydraulic conductivity (ft/day) | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| i | hydraulic gradient | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| A | gross flow area (ft^2) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| v | discharge velocity | Hydraulic study | From the hydraulic model or study (HEC-RAS, FHWA HEC-18), stream gauge records or the drainage design. | project-specific |
| vs | seepage (pore) velocity | Field test | Seismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves. | soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group |
| n | porosity | Another equation | n = e/(1 + e), from the void ratio. | 0.25–0.55 for most mineral soils · by USCS group |
Use. Laminar flow in soil.
Limitations. Turbulent flow in open-graded ballast and coarse gravel departs from Darcy. Field k can differ from laboratory k by orders of magnitude.
Source. Darcy 1856 [17] · In the manual: Ch 2.8 Eq. 2.8-11, Ch 2.8 Eq. 2.8-13
Variables. Q = volume collected (ft3) in time t (s); L = specimen length (ft); A = specimen area (ft2); Δh = head difference (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Q | volume collected (ft^3) in time t (s) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| L | specimen length (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| A | specimen area (ft^2) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| Δh | head difference (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
Use. Clean sands and gravels.
Limitations. Use de-aired water and keep gradients low to stay laminar.
Source. ASTM D2434 [17] · In the manual: Ch 2.8 Eq. 2.8-6
Variables. a = standpipe area (ft2); h1, h2 = heads at the start and end of time t (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| a | standpipe area (ft^2) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
Use. Silts and clays.
Limitations. Confirm saturation (B-value) before testing.
Source. ASTM D5084 [17] · In the manual: Ch 2.8 Eq. 2.8-7
Variables. ki, Hi = permeability and thickness of layer i
Use. Stratified alluvium and embankment fill.
Limitations. Thin continuous sand seams control kh; a single clay layer controls kv.
Source. Harr 1962 [24] · In the manual: Ch 2.8 §2.8.5
Variables. H = total head loss (ft); Nf = number of flow channels; Nd = number of equipotential drops; ℓ = length of the last flow-net square at the exit (ft); q in ft3/day per ft
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| H | total head loss (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| Nf | number of flow channels | Hydraulic study | From the hydraulic model or study (HEC-RAS, FHWA HEC-18), stream gauge records or the drainage design. | project-specific |
| Nd | number of equipotential drops | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| ℓ | length of the last flow-net square at the exit (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Steady seepage under or through embankments and cofferdams.
Limitations. For anisotropic soil, draw the net on a transformed section (x scaled by √(kv/kh)) and use k = √(khkv).
Source. Forchheimer; Cedergren 1989 [14] · In the manual: Ch 2.8 Eq. 2.8-14
Variables. γ' = buoyant unit weight (pcf); ti = thickness of each blanket layer (ft); hp = piezometric head at the base of the blanket above its base (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| γ' | buoyant unit weight (pcf) | Another equation | γ' = γsat − γw (γw = 62.4 pcf). Use below the water table. | 50–75 pcf for most mineral soils · by USCS group |
| ti | thickness of each blanket layer (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| hp | piezometric head at the base of the blanket above its base (ft) | Field measurement | Groundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level. | project-specific |
| Gs | specific gravity of solids | Lab test | Specific gravity of solids (ASTM D854). 2.65–2.70 is usually adequate for mineral soils when untested. | 2.64–2.80 mineral; lower if organic · by USCS group |
Use. Toe of embankments next to waterways, excavation bottoms and boils.
Limitations. Use large factors (the manual cites FS ≥ 4.0 for piping) because exit gradients are hard to estimate.
Source. Terzaghi 1943 [57] [14] · In the manual: Ch 2.8 Eq. 2.8-15, Ch 2.8 Eq. 2.8-16
Variables. b = aquifer thickness (ft); h1, h2 = heads at radial distances r1, r2 (ft); Q in ft3/day (1 gpm = 192.5 ft3/day)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| b | aquifer thickness (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Dewatering estimates and analysis of steady-state pumping tests.
Limitations. Fully penetrating well, homogeneous isotropic aquifer, steady state.
Source. Thiem 1906 [60] · In the manual: Ch 2.8 §2.8.6
Variables. H = saturated thickness before pumping (ft); hw = water depth in the well (ft); R = radius of influence (ft); rw = well radius (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| H | saturated thickness before pumping (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| hw | water depth in the well (ft) | Field measurement | Groundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level. | project-specific |
| R | radius of influence (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| rw | well radius (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
Use. Wellpoint and deep-well yield in water-table aquifers.
Limitations. Dupuit assumes horizontal flow; drawdown at the well is under-predicted when it is large. Q is not sensitive to R because R enters through a logarithm.
Source. Dupuit 1863; Thiem 1906 [19] [60] · In the manual: Ch 2.8 Eq. 2.8-19
Variables. s = drawdown (ft); T = transmissivity (ft2/day); S = storativity; Δs = drawdown per log cycle of time (ft); t0 = zero-drawdown time intercept (days); r = distance to the observation well (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| s | drawdown (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| T | transmissivity (ft^2/day) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| S | storativity | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Δs | drawdown per log cycle of time (ft) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| t0 | zero-drawdown time intercept (days) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| r | distance to the observation well (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Confined aquifer pumping tests.
Limitations. Valid when u = r2S / (4Tt) ≤ 0.01 (some references accept 0.05); discard early-time data that do not meet it.
Source. Cooper & Jacob 1946 [15] · In the manual: Ch 2.8 Eq. 2.8-8, Ch 2.8 Eq. 2.8-10
Variables. rc = casing radius (ft); rw = effective well radius (ft); Re = effective radius from the Bouwer–Rice coefficients (ft); Le = screen length (ft); y0, yt = head displacement at the start and at time t
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| rc | casing radius (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| rw | effective well radius (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
| Re | effective radius from the Bouwer–Rice coefficients (ft) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Le | screen length (ft) | Test setup | Dimension of the test equipment or specimen: from the test standard or the lab/field test record. | project-specific |
Use. Hydraulic conductivity of the soil around a monitoring well or piezometer.
Limitations. Tests only a small volume; a poorly developed screen gives low k.
Source. Bouwer & Rice 1976 [10] · In the manual: Ch 2.8 Eq. 2.8-5
Variables. h1, h2 = saturated heights above the impermeable base at the source and at the drain (ft); L = flow length (ft); q in ft3/day per ft of drain
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| L | flow length (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Sizing longitudinal subdrains and side ditches that lower the water table under track.
Limitations. Horizontal flow; add rainfall infiltration separately where it is significant.
Source. Dupuit 1863 [19] [14] · In the manual: Ch 2.3 §2.3.8
Variables. ks = saturated conductivity; Se = effective saturation from the van Genuchten water retention curve; n = van Genuchten parameter
Use. Seasonal infiltration and pore pressure in unsaturated fill.
Limitations. Conductivity is lower on wetting than drying at the same suction (hysteresis); field data for dumped fills are scarce.
Source. van Genuchten 1980; applied to railway embankments by O'Brien 2013 [76] [67] · In the manual: Ch 6.4 §6.4.12