↑ Parent Menu⌂ Main Menu
← Appendix F Analytical Equations
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

F.8 Seismic and Dynamic Response

The closed-form equations of soil and rock mechanics used in this manual, 97 entries in nine families, each with its variables, the conditions it assumes, its source and the sections that use it. English units throughout.
Author: Daniel P. Colwell
F.8 Seismic and Dynamic Response

Wave-velocity moduli, site period, the liquefaction demand and capacity ratio, Newmark yield acceleration and seismic refraction.

DY-01Small-strain elastic moduli from wave velocityGmax
Gmax = ρ Vs2 = (γ / g) · Vs2    E = 2G (1 + ν)    M = (γ / g) · Vp2

Variables. γ = unit weight (pcf); g = 32.2 ft/s2; Vs, Vp = shear and compression wave velocity (ft/s); G, E, M in psf

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
γunit weight (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
g32.2 ft/s^2ConstantPhysical constant or standard value.project-specific
Vsshear-wave velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Interpreting MASW, crosshole, downhole and seismic CPT data.

Limitations. Very small strain (< 10−4%); reduce for design strain levels. Vp in saturated soil reflects the water (about 5,000 ft/s), not the soil skeleton.

Source. Elastic wave theory; Kramer 1996 [32] · In the manual: Ch 5.1 Eq. 5.1-15

DY-02Time-averaged shear wave velocityV̄s
V̄s = Σ di / Σ (di / Vs,i)    (top 100 ft for site class)

Variables. di = thickness of layer i (ft); Vs,i = its shear wave velocity (ft/s)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
dithickness of layer i (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
Vs,iits shear wave velocity (ft/s)Field testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Seismic site classification.

Limitations. A travel-time average, not an arithmetic average; one soft layer pulls it down strongly.

Source. ASCE 7-22 [2] · In the manual: Ch 5.1 Eq. 5.1-16, Ch 6.5 §6.5.3

DY-03Fundamental period of a soil columnTs
Ts = 4H / V̄s

Variables. H = depth to bedrock or a strong impedance contrast (ft); V̄s = average shear wave velocity over H (ft/s)

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
Hdepth to bedrock or a strong impedance contrast (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
V̄saverage shear wave velocity over H (ft/s)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific

Use. Judging resonance of deep soft sites with bridge periods or embankment response.

Limitations. Single uniform layer on rigid base; period lengthens as strains increase during strong shaking.

Source. Kramer 1996 [32] · In the manual: Ch 6.5 §6.5.3

DY-04Cyclic stress ratio (Seed–Idriss)CSR
CSR = 0.65 · (amax / g) · (σv / σ'v) · rd

Variables. amax/g = peak ground surface acceleration (fraction of g); σv, σ'v = total and effective vertical stress at depth (psf); rd = stress reduction coefficient (Chapter 6.5)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
amax/gpeak ground surface acceleration (fraction of g)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
rdstress reduction coefficient (Chapter 6.5)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
σ'vvertical stress / pore pressureAnother equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Liquefaction triggering demand at level-ground sites.

Limitations. Derived from a rigid-column argument with an empirical rd; use site response analysis where the soil profile is unusual or amax is large.

Source. Seed & Idriss 1971 [48] [66] · In the manual: Ch 6.5 §6.5.4

DY-05Factor of safety against liquefactionFSL
FSL = (CRR7.5 · MSF · Kσ · Kα) / CSR

Variables. CRR7.5 = cyclic resistance ratio for M7.5 from SPT, CPT or Vs (empirical curves); MSF = magnitude scaling factor; Kσ, Kα = overburden and static shear corrections

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
CRR7.5cyclic resistance ratio for M7.5 from SPT, CPT or V_s (empirical curves)Field testStandard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60.loose sand 4–10, dense 30–50 blows/ft · by USCS group
MSFmagnitude scaling factorPublished hazard / climate dataUSGS seismic design data / ASCE 7 hazard tool for the site location and site class (from Vs30 or SPT).project-specific
Vsshear-wave velocityField testSeismic CPT, downhole or crosshole (ASTM D4428 / D7400), or MASW surface waves.soft clay 250–500, dense sand 800–1,600 ft/s · by USCS group

Use. Saturated sands, non-plastic silts and gravelly sands.

Limitations. The ratio is analytical; CRR, MSF and K factors are empirical (see the Empirical Equations reference). Plastic fine-grained soils need cyclic softening criteria instead.

Source. Youd et al. 2001 [66] · In the manual: Ch 6.5 §6.5.4

DY-06Newmark yield accelerationky
Planar block: ky = (FSstatic − 1) · sin α
General: ky = the kh that gives FS = 1.0 in SL-05, SL-06 or SL-10

Variables. FSstatic = static factor of safety; α = angle of the sliding surface (for an infinite slope, α = β); ky as a fraction of g

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
FSstaticintermediate value computed on this pageAnother equationComputed: FS_static = static factor of safetyproject-specific
αangle of the sliding surface (for an infinite slope, α = β)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Input to permanent displacement estimates of slopes and embankments.

Limitations. Rigid sliding block; use the strength expected during shaking (reduced if strain-softening or excess pore pressure develops). The displacement correlations that use ky are empirical.

Source. Newmark 1965 [42] [30] · In the manual: Ch 6.5 §6.5.8, Ch 6.3 §6.3.4

DY-07Seismic refraction, two layersxc, h1
xc = 2h1 · √[ (V2 + V1) / (V2 − V1) ]    h1 = (xc / 2) · √[ (V2 − V1) / (V2 + V1) ]
From the intercept time: h1 = ti · V1 V2 / (2 √(V22 − V12))

Variables. V1, V2 = layer velocities (ft/s), V2 > V1; xc = crossover distance (ft); ti = intercept time (s); h1 = depth to the refractor (ft)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
xccrossover distance (ft)Field test (geophysics)Seismic refraction (ASTM D5777), MASW, or ground-penetrating radar (ASTM D6432), read from the field record.project-specific
tiintercept time (s)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
h1depth to the refractor (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific

Use. Depth to rock or to the water table along cuts and proposed structure sites.

Limitations. Fails where velocity decreases with depth (hidden layer) or where a thin layer does not produce first arrivals.

Source. Redpath 1973 [47] · In the manual: Ch 5.1 Eq. 5.1-17, Ch 5.1 Eq. 5.1-18

← Previous · Appendices Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit
Next · Appendices → Appendix G — ICE Manual Cross-Reference