↑ Parent Menu⌂ Main Menu
← Appendix F Analytical Equations
GHRM
Railway Ground Hazard Risk Management · Appendices
Sections · click a car to open it

F.6 Lateral Earth Pressure and Retaining Walls

The closed-form equations of soil and rock mechanics used in this manual, 97 entries in nine families, each with its variables, the conditions it assumes, its source and the sections that use it. English units throughout.
Author: Daniel P. Colwell
F.6 Lateral Earth Pressure and Retaining Walls

At-rest, active, passive and seismic earth pressure, surcharge from track loads, and the external stability of walls.

EP-01At-rest earth pressureK0
K0 = (1 − sin φ') · OCRsin φ'
σ'h0 = K0 · σ'v    σh0 = σ'h0 + u

Variables. φ' = friction angle; OCR = overconsolidation ratio; σ'v = effective vertical stress (psf)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
φ'friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
OCRoverconsolidation ratioLab test (or correlation)Preconsolidation stress from the consolidation curve (Casagrande or work method, ASTM D2435). CPT screening: σ'p ≈ 0.33(qt − σv). OCR = σ'p/σ'v0.OCR 1 (NC) to > 4 (heavily OC) · by USCS group
σ'veffective vertical stress (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific

Use. Walls that cannot move (culvert walls, braced or restrained abutments).

Limitations. Semi-empirical; compaction behind a rigid wall can raise lateral pressure above K0 near the top.

Source. Jaky 1944; Mayne & Kulhawy 1982 [28] [35] · In the manual: Ch 7.1 §7.1.2

EP-02Rankine active and passive pressureKa, Kp
Ka = tan2(45° − φ'/2)    Kp = tan2(45° + φ'/2)
σ'a = Ka σ'v − 2c' √Ka    σ'p = Kp σ'v + 2c' √Kp

Variables. σ'v = effective vertical stress at depth (psf); c' = effective cohesion (psf)

Inputs: where each value comes from (3)
SymbolWhat it isComes fromHow to get itTypical range
σ'veffective vertical stress at depth (psf)Another equationFrom unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level.project-specific
c'effective cohesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Vertical, frictionless back face with level backfill; the AREMA standard case with c' = 0.

Limitations. Active pressure needs wall movement of roughly 0.001H (dense sand) to 0.004H (loose sand); passive needs about ten times more. Neglect negative active pressure from c'.

Source. Rankine 1857 [46] · In the manual: Ch 7.1 §7.1.2

EP-03Rankine active pressure, sloping backfillKa
Ka = cos β · [ cos β − √(cos2β − cos2φ') ] / [ cos β + √(cos2β − cos2φ') ]
Resultant acts parallel to the backfill slope

Variables. β = backfill slope angle above horizontal (β ≤ φ')

Inputs: where each value comes from (2)
SymbolWhat it isComes fromHow to get itTypical range
βbackfill slope angle above horizontal (β ≤ φ')Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Cantilever walls with a sloping backfill, using the vertical plane through the heel.

Limitations. Not defined for β > φ'.

Source. Rankine 1857 [46] · In the manual: Ch 7.1 §7.1.2

EP-04Coulomb active and passive coefficientsKa, Kp
Ka = sin2(α + φ') / { sin2α · sin(α − δ) · [ 1 + √( sin(φ' + δ) sin(φ' − β) / (sin(α − δ) sin(α + β)) ) ]2 }
Kp = sin2(α − φ') / { sin2α · sin(α + δ) · [ 1 − √( sin(φ' + δ) sin(φ' + β) / (sin(α + δ) sin(α + β)) ) ]2 }

Variables. α = angle of the wall back face from horizontal (90° vertical); δ = wall friction angle; β = backfill slope above horizontal

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
αangle of the wall back face from horizontal (90° vertical)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
δwall friction angleLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group
βbackfill slope above horizontalProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group

Use. Gravity, semi-gravity and MSE walls where wall friction acts.

Limitations. Coulomb Kp is unconservative for δ > φ'/2; use log-spiral values for passive resistance.

Source. Coulomb 1776 [16] · In the manual: Ch 7.1 §7.1.2

EP-05Resultant thrust with surcharge and waterPa
Pa = ½ Ka γ H2   (at H/3)    + Ka q H   (at H/2)
Water table at depth H1: use γ' below it and add Pw = ½ γw (H − H1)2

Variables. H = wall height (ft); γ = backfill unit weight (pcf); q = uniform surcharge (psf; Cooper E-80 equivalent 400 psf × DLF in the manual); thrust in lb/ft

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Hwall height (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
γbackfill unit weight (pcf)Lab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group
quniform surcharge (psfLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
γ'buoyant unit weightAnother equationγ' = γsat − γw (γw = 62.4 pcf). Use below the water table.50–75 pcf for most mineral soils · by USCS group

Use. Wall design loads.

Limitations. A uniform surcharge is a simplification for track loads close to the wall; use EP-06 when the track is within about H of the wall.

Source. Rankine 1857; AREMA MRE Ch. 8 [46] [1] · In the manual: Ch 7.1 §7.1.2, Ch 7.1 §7.1.3

EP-06Lateral pressure from a strip or line loadσh
Strip load: σh = (2q/π) · (β − sin β cos 2α)
Line load, m = x/H > 0.4: σh = (4QL / πH) · m2 n / (m2 + n2)2    m ≤ 0.4: σh = (QL / H) · 0.203 n / (0.16 + n2)2

Variables. q = strip pressure (psf); β = angle subtended by the strip at the point on the wall (radians); α = angle from the vertical to the bisector of β (radians); QL = line load (lb/ft); x = distance from the wall to the line load (ft); n = z/H

Inputs: where each value comes from (6)
SymbolWhat it isComes fromHow to get itTypical range
qstrip pressure (psf)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
βangle subtended by the strip at the point on the wall (radians)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
αangle from the vertical to the bisector of β (radians)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
QLline load (lb/ft)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
xdistance from the wall to the line load (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
nintermediate value computed on this pageAnother equationComputed: n = z/Hproject-specific

Use. Track loads parallel to an abutment or wall; the strip form is the AREMA basis for Cooper E-80 surcharge.

Limitations. Boussinesq solutions doubled for an unyielding wall; overestimate pressure on walls that can yield. Use the dynamic track load as q.

Source. Terzaghi 1954; NAVFAC 1986; AREMA MRE Ch. 8 [58] [40] [1] · In the manual: Ch 7.1 §7.1.3

EP-07Seismic active thrust (Mononobe–Okabe)KAE
PAE = ½ γ H2 (1 − kv) KAE    θ = tan−1[ kh / (1 − kv) ]
KAE = cos2(φ' − θ − ψ) / { cos θ cos2ψ cos(δ + ψ + θ) [ 1 + √( sin(φ' + δ) sin(φ' − θ − β) / (cos(δ + ψ + θ) cos(β − ψ)) ) ]2 }
ΔPAE = PAE − Pa   at about 0.6H (Seed & Whitman 1970)

Variables. ψ = batter of the wall back face from vertical (0 for a vertical wall); β = backfill slope; kh, kv = seismic coefficients (fractions of g)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
ψbatter of the wall back face from vertical (0 for a vertical wall)Lab or field testLab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening.soft 250–500, stiff 1,000–2,000 psf · by USCS group
βbackfill slopeProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
φ'effective friction angleLab test (or correlation)Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08).sands 30–42°, clays 17–32° · by USCS group
γtotal (moist) unit weightLab testWeigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w).sands 105–135, clays 95–130 pcf · by USCS group

Use. Yielding walls with dry cohesionless backfill.

Limitations. Requires φ' − θ − β ≥ 0; no solution otherwise. The wall angle here is measured from vertical (unlike EP-04). Not for saturated backfill without hydrodynamic terms.

Source. Okabe 1926; Mononobe & Matsuo 1929 [43] [39] [49] · In the manual: Ch 7.1 §7.1.7

EP-08Retaining wall stability checksFS, e
FSsliding = (ΣV · tan δb + B ca + Pp) / ΣPh    FSoverturning = ΣMR / ΣMO
e = B/2 − (ΣMR − ΣMO) / ΣV    qmax, min = (ΣV / B)(1 ± 6e/B)

Variables. ΣV = total vertical load on the base (lb/ft); δb = base friction angle; ca = base adhesion (psf); Pp = passive resistance relied on (lb/ft); ΣPh = horizontal driving forces; MR, MO = resisting and overturning moments about the toe (ft-lb/ft)

Inputs: where each value comes from (5)
SymbolWhat it isComes fromHow to get itTypical range
ΣVtotal vertical load on the base (lb/ft)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
δbbase friction angleLab test (or fraction of φ')Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic).0.6–1.0 φ' · by USCS group
cabase adhesion (psf)Lab testEffective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more.0–300 psf · by USCS group
Pppassive resistance relied on (lb/ft)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
ΣPhhorizontal driving forcesLoading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific

Use. Cantilever, gravity and semi-gravity walls.

Limitations. Count passive resistance only below frost depth and below any soil that may be excavated. Also check bearing (BC-01, BC-07) and global stability (SL-05).

Source. Bowles 1996; AREMA MRE Ch. 8 [11] [1] · In the manual: Ch 7.1 §7.1.5, Ch 7.1 §16.9

EP-09Compaction-induced lateral pressure (Ingold)σ′h,m
σ′h,m = √(2Pγ/π);   zcr = K0√(2P/(πγ));   hc = (1/K0)√(2P/(πγ))

Variables. P = effective roller line load (lb/ft); γ = fill unit weight; envelope σv/K0 to zcr, constant to hc, then K0σv

Use. Rigid walls, headwalls and abutments with compacted backfill.

Limitations. For walls that do not yield to the active state; add surcharge and water separately.

Source. Pickles 2012 (Eqs. 64.1–64.3) [71] · In the manual: Ch 7.1 §7.1.19

EP-10Passive resistance of discrete piles (soldier piles)P
P = Kp b p′v (z ≤ 1.5b);   P = Kp² b p′v (z ≥ 1.5b);   P = (2 + 7z/3b) su b (z ≤ 3b);   P = 9 su b (z ≥ 3b)

Variables. b = pile width; z = depth below excavation; p′v = effective overburden there; spacing s > 3b; divide by s for per-foot-of-wall values

Use. Embedment of soldier piles below an excavation.

Limitations. Ultimate values; valid for Kp 3.0–5.3. Vol. II prints ≤ in both depth limits; the second of each pair is evidently ≥.

Source. Pickles 2012 (Eqs. 64.5–64.8), after Barton 1982 and Fleming et al. 1994 [71] · In the manual: Ch 7.1 §7.1.4.7

EP-11Depth of softened clay in front of an embedded wallL
L = √(12 cv t)

Variables. cv = coefficient of consolidation; t = time the excavation is open

Use. su taken as zero at the excavation level rising to the design value at depth L.

Limitations. Where no groundwater recharge is possible, use about 1.6 ft (0.5 m).

Source. Pickles 2012 (Eq. 64.4) [71] · In the manual: Ch 7.1 §7.1.4.7

EP-12Ground anchor fixed length from bondTult
Tult = π d L τult;   Tdesign = Tult/F

Variables. d = borehole diameter; L = fixed anchor length; τult = grout–ground bond (in clay αcu); F = global factor

Use. Preliminary fixed length of tiebacks.

Limitations. Bond values must be confirmed by anchor tests.

Source. Turner 2012 (Eqs. 66.1–66.6) [72] · In the manual: Ch 7.1 §7.1.4.7

← Previous · Appendices Appendix D — Typical Soil Properties from Blow Counts, Moisture Content and Liquid Limit
Next · Appendices → Appendix G — ICE Manual Cross-Reference