Appendix F collects the analytical equations used across the manual in one place, in English (U.S. customary) units. An analytical equation comes from mechanics: equilibrium, elasticity, flow or wave theory. It is exact for the model it describes. That is the difference from the Empirical Equations & Correlations reference, whose entries are statistical fits to test data.
Exact for the model does not mean exact for the site. Every equation here rests on assumptions, such as an elastic half-space, a circular slip surface, one-dimensional drainage or steady seepage, and its inputs (strength, stiffness, permeability, pore pressure) carry the uncertainty of the investigation. The Limitations line in each entry states the assumption most likely to be violated in railroad work. A few entries combine an analytical form with empirical coefficients (for example, the β method for piles or the impact factor for wheel loads); those are flagged in the entry.
When an equation is used, report with the result:
| Quantity | Unit | Value or note |
|---|---|---|
| Length, depth, thickness | ft (in. for rail and tie dimensions) | |
| Stress, pressure, strength | psf (psi for track and plate tests; tsf where noted) | 1 psi = 144 psf; 1 tsf = 2,000 psf |
| Unit weight | pcf | γw = 62.4 pcf |
| Force and load | lb, kips; lb/ft for plane-strain problems | Cooper E-80 wheel = 40,000 lb |
| Hydraulic conductivity | ft/day (ft/s for laboratory tests) | 1 ft/s = 86,400 ft/day |
| Flow | ft3/day | 1 gpm = 192.5 ft3/day |
| Acceleration | g | g = 32.2 ft/s2 |
| Atmospheric pressure | psf | Pa = 2,116 psf (14.7 psi) |
| Angles | degrees, unless the entry says radians |
| Section | Family | ID prefix | Entries |
|---|---|---|---|
| F.1 | Stresses in Soil: Effective Stress and Elastic Load Spread | ST- | 9 |
| F.2 | Track Structure: Beam on Elastic Foundation and Load Spread | TR- | 7 |
| F.3 | Bearing Capacity and Deep Foundations | BC- | 19 |
| F.4 | Settlement and Consolidation | SE- | 14 |
| F.5 | Slope Stability (Limit Equilibrium) | SL- | 13 |
| F.6 | Lateral Earth Pressure and Retaining Walls | EP- | 12 |
| F.7 | Groundwater, Seepage and Wells | GW- | 12 |
| F.8 | Seismic and Dynamic Response | DY- | 7 |
| F.9 | Subgrade, Frost and Reinforcement | SG- | 4 |
Each entry links to the sections of the manual where the equation is used. Use the search box below to find an equation by symbol, name or author.