Ultimate capacity of shallow footings and static axial capacity of piles and shafts.
Variables. c' = cohesion (psf); q = γ · Df, effective overburden at footing base (psf); γ = effective unit weight below the base (pcf); B = footing width, or B' for eccentric load (ft); N = bearing capacity factors (BC-02); F = shape, depth and inclination factors (BC-03 to BC-05)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| c' | cohesion (psf) | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| q | intermediate value computed on this page | Another equation | Computed: q = γ · D_f, effective overburden at footing base (psf) | project-specific |
| γ | effective unit weight below the base (pcf) | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| B | footing width, or B' for eccentric load (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| N | bearing capacity factors (BC-02) | Field test | Standard Penetration Test (ASTM D1586); measure hammer energy (ASTM D4633, withdrawn 2025) to correct to N60. | loose sand 4–10, dense 30–50 blows/ft · by USCS group |
| F | intermediate value computed on this page | Another equation | Computed: F = shape, depth and inclination factors (BC-03 to BC-05) | project-specific |
Use. Shallow footings on soil, Df ≤ about B. Use drained (c', φ') or undrained (su, φ = 0) parameters as the loading requires.
Limitations. Assumes general shear failure. For loose sand or soft clay (local or punching shear) reduce strength (c* = 0.67c', tan φ* = 0.67 tan φ') or check settlement, which usually governs. Use γ' (buoyant) where the water table is within B below the base.
Source. Terzaghi 1943; Meyerhof 1963; Vesić 1973 [57] [38] [63] · In the manual: Ch 6.1 Eq. 6.1-1
Variables. φ' = friction angle of the bearing soil (degrees)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| φ' | friction angle of the bearing soil (degrees) | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. With BC-01.
Limitations. Nγ varies widely between authors (Vesić, Meyerhof, Hansen); state which is used. Factors grow very quickly above φ' ≈ 35°, so a few degrees of overestimate in φ' gives a large overestimate in capacity.
Source. Prandtl 1921; Reissner 1924; Vesić 1973 [63] · In the manual: Ch 6.1 Eq. 6.1-2
Variables. B, L = footing width and length (ft), L ≥ B; use B', L' for eccentric loads. Strip: B/L = 0; square or circle: B/L = 1
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. Rectangular, square and circular footings with BC-01.
Limitations. Empirically calibrated from model tests; do not mix shape factors from one author with Nγ from another.
Source. De Beer 1970, as given by Vesić 1973 [63] · In the manual: Ch 6.1 Eq. 6.1-3
Variables. Df = embedment depth (ft); B = footing width (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Df | embedment depth (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| B | footing width (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
Use. Embedded footings where the soil above the base is competent and will remain in place.
Limitations. Omit depth factors (set to 1) where the embedment soil may be removed by scour, excavation or trenching, or is loose fill.
Source. Hansen 1970 [23] [63] · In the manual: Ch 6.1 Eq. 6.1-4
Variables. β = inclination of the resultant load from vertical (degrees); φ' = friction angle (degrees). If β ≥ φ', Fγi = 0
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| β | inclination of the resultant load from vertical (degrees) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | friction angle (degrees) | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. Abutments and wall footings with horizontal thrust.
Limitations. Also check sliding separately (EP-08); a footing can satisfy bearing and still slide.
Source. Meyerhof 1963; Hanna & Meyerhof 1981 [38] · In the manual: Ch 6.1 Eq. 6.1-5
Variables. su = undrained shear strength within about B below the base (psf); q = total overburden at the base (psf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su | undrained shear strength within about B below the base (psf) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| q | total overburden at the base (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
Use. Short-term (end-of-construction) capacity of saturated clay; the manual's subgrade allowable stress qu/(π + 2)/FS is this case with qu = 2su.
Limitations. Total-stress analysis: valid only for rapid loading of saturated clay. Correct field vane su with Bjerrum's factor; Nc is capped near 9 for deep foundations.
Source. Skempton 1951 [51] · In the manual: Ch 6.1 §6.1.2, Ch 2.3 §2.3.4
Variables. P = vertical load (lb); M = moment about the footing centroid (ft-lb); B, L = footing dimensions (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| P | vertical load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| M | moment about the footing centroid (ft-lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
Use. Abutments, wall footings and crane-rail foundations with moment.
Limitations. Use B', L' in BC-01 to BC-05, and full B, L for settlement. AREMA keeps the resultant within the middle third (e ≤ B/6) for unfactored loads.
Source. Meyerhof 1953 [37] [11] · In the manual: Ch 6.1 Eq. 6.1-7, Ch 7.1 §7.1.5
Variables. q = overburden pressure at the base (psf); FS = factor of safety (typically 2.5 to 3.0 for railroad structures)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| q | overburden pressure at the base (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| FS | factor of safety (typically 2.5 to 3.0 for railroad structures) | Design criterion | Set by the client railroad standards, AREMA, AASHTO, USACE or the project specification. | typically 2.5 to 3.0 for railroad structures |
Use. Converting ultimate to allowable capacity.
Limitations. The FS covers strength uncertainty only. The allowable pressure for design is the lower of this value and the pressure that gives tolerable settlement (SE-01 to SE-03).
Source. Terzaghi & Peck 1967 [59] · In the manual: Ch 6.1 Eq. 6.1-6
Variables. fs = unit shaft resistance in layer i (psf); As = shaft surface area in layer i (ft2); qp = unit tip resistance (psf); Ap = tip area (ft2)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| fs | unit shaft resistance in layer i (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| As | shaft surface area in layer i (ft^2) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| qp | unit tip resistance (psf) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| Ap | tip area (ft^2) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Driven piles and drilled shafts; fs and qp come from BC-10 to BC-12.
Limitations. Static analysis sets the estimate only; confirm with dynamic testing (PDA/CAPWAP) or a load test. Exclude shaft resistance in scourable, liquefiable or downdrag zones.
Source. Hannigan et al. 2016 [21] · In the manual: Ch 6.1 Eq. 6.1-9
Variables. σ'v = effective vertical stress at mid-layer (psf); K = lateral earth pressure coefficient on the shaft; δ = pile–soil interface friction angle
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σ'v | effective vertical stress at mid-layer (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| K | lateral earth pressure coefficient on the shaft | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| δ | pile–soil interface friction angle | Lab test (or fraction of φ') | Interface direct shear (ASTM D5321); otherwise δ = 0.6–1.0 φ' depending on the surface (steel, concrete, geosynthetic). | 0.6–1.0 φ' · by USCS group |
Use. Sands, and long-term capacity in clays.
Limitations. The form is analytical, but K and δ are empirical and depend on installation; typical β = 0.25–0.40 for steel H-piles in sand. Do not let fs grow without limit with depth.
Source. Burland 1973 [12] [21] · In the manual: Ch 6.1 Eq. 6.1-12
Variables. α = adhesion factor (from the correlations in Chapter 6.1, Equation 6.1-11); su = undrained shear strength (psf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| α | adhesion factor (from the correlations in Chapter 6.1, Equation 6.1-11) | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| su | undrained shear strength (psf) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
Use. Short-term capacity of piles and shafts in saturated clay.
Limitations. α is empirical; see the Empirical Equations reference for its limits. Nc = 9 assumes the tip is at least about 4 diameters into the bearing clay.
Source. Skempton 1951; Tomlinson 1957 [51] [21] · In the manual: Ch 6.1 Eq. 6.1-10
Variables. σ'v,tip = effective vertical stress at the tip (psf); Nq* = bearing capacity factor for deep foundations (Vesić or Meyerhof chart)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| σ'v,tip | effective vertical stress at the tip (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| Nq* | bearing capacity factor for deep foundations (Vesić or Meyerhof chart) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Use. Driven piles ending in sand or gravel.
Limitations. Nq* is highly sensitive to φ'. Cap qp at the limiting value (often 100–150 tsf for driven piles) and check against CPT or SPT-based methods.
Source. Meyerhof 1976; Vesić 1977 [21] · In the manual: Ch 6.1 Eq. 6.1-14
Variables. m = number of columns; n = number of rows; D = pile diameter (ft); S = center-to-center spacing (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| m | number of columns | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| n | number of rows | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| D | pile diameter (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| S | center-to-center spacing (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Friction piles in clay at close spacing.
Limitations. Geometric rule, not mechanics. Driven piles in sand typically show η ≥ 1; for clay, also check block failure (BC-14) and use the lower capacity.
Source. Converse–Labarre formula, as given by Bowles 1996 [11] · In the manual: Ch 6.1 Eq. 6.1-17
Variables. Dg = embedded depth of the group (ft); Bg, Lg = plan dimensions of the block around the outer piles (ft); s̄u = average su along the block perimeter (psf); su,tip = su at tip level (psf); Nc from BC-06 (up to 9)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Dg | embedded depth of the group (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| s̄u | average s_u along the block perimeter (psf) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| su,tip | s_u at tip level (psf) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| Nc | intermediate value computed on this page | Another equation | Computed: N_c = from BC-06 (up to 9) | project-specific |
Use. Closely spaced friction pile groups in clay.
Limitations. Compare with the sum of individual pile capacities × η; the smaller governs.
Source. Terzaghi & Peck 1967 [59] · In the manual: Ch 6.1 Eq. 6.1-18
Variables. fs,t = unit shaft resistance in tension (psf, typically 0.75–0.80 of compression); Wp = effective pile weight (lb)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| fs,t | unit shaft resistance in tension (psf, typically 0.75–0.80 of compression) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | typically 0.75–0.80 of compression |
| Wp | effective pile weight (lb) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Use. Tension piles, frost-jacking checks and overturning restraint.
Limitations. Use buoyant pile weight below the water table. Frost heave adfreeze is a separate load to be added, not a capacity.
Source. Hannigan et al. 2016 [21] · In the manual: Ch 6.1 Eq. 6.1-19
Variables. Δ = pile head settlement at load P; K = intercept of the Δ/P against Δ line; 1/U = its slope
Use. Ultimate capacity from a static test stopped before failure.
Limitations. Hyperbolic fits tend to overestimate capacity; use as an upper estimate and check a settlement-based criterion.
Source. Chin 1972, as given by Brown 2012 (Eq. 98.1) [73] · In the manual: Ch 5.3 §5.3.5.4
Variables. qc,m = weighted average cone resistance from 8D above to 4D below the toe; qb,0.1 = base resistance at settlement of 10% of the diameter
Use. Base resistance of piles in sand from CPT soundings.
Limitations. Shaft resistance correlations with qc vary from about qc/10 to qc/40; use BC-12 for the shaft.
Source. Bell and Robinson 2012 (Eqs. 54.13–54.14); Lehane et al. 2005 [75] · In the manual: Ch 6.1 §6.1.5.5
Variables. E, ρ = modulus and density of the pile; L = pile length; A = section area; Z = impedance; Δf = spacing of resonant peaks
Use. Interpreting sonic echo and frequency-response tests; checking pile length.
Limitations. Resolution falls in long piles and stiff ground; confirm suspected defects by cross-hole sonic logging.
Source. French and Turner 2012 (Eqs. 97.1–97.5) [74] · In the manual: Ch 5.3 §5.3.5.4
Variables. F = force; v = particle velocity; J = Case damping factor (sand 0.015–0.06 s/ft to clay 0.18–0.34 s/ft); vtoe = toe velocity
Use. Removing the dynamic (damping) resistance from a dynamic load test to estimate static capacity.
Limitations. Signal matching is preferred to the closed-form Case method; J depends on soil type.
Source. Brown 2012 (Eqs. 98.4–98.9; Table 98.6) [73] · In the manual: Ch 5.3 §5.3.5.4