Limit-equilibrium factors of safety for infinite slopes, circular and non-circular slip surfaces, and planar rock slides, with water and seismic loading.
Variables. φ' = friction angle; β = slope angle
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| φ' | friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| β | slope angle | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Shallow sliding in clean sand, gravel and ballast shoulders.
Limitations. Shallow, slope-parallel failure only. Seepage out of the face roughly halves FS (SL-02).
Source. Taylor 1948 [55] [18] · In the manual: Ch 6.3 §6.3.2
Variables. c' = effective cohesion (psf); γ = total unit weight (pcf; γsat below the phreatic surface); z = vertical depth to the slip surface (ft); m = height of the phreatic surface above the slip surface as a fraction of z (0 dry, 1 at the ground surface); β = slope angle
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| c' | effective cohesion (psf) | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| γ | total unit weight (pcf | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| z | vertical depth to the slip surface (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| m | height of the phreatic surface above the slip surface as a fraction of z (0 dry, 1 at the ground surface) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| β | slope angle | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
Use. Shallow translational slides in embankment side slopes and residual soil cuts after rain.
Limitations. Assumes flow parallel to the slope. Use c' ≈ 0 unless shallow-stress testing supports more; a small c' has a large effect at shallow depth.
Source. Skempton & DeLory 1957 [52] [18] · In the manual: Ch 6.3 Eq. 6.3-15, Ch 3.8 §3.8.3
Variables. su = undrained shear strength at depth z (psf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| su | undrained shear strength at depth z (psf) | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. Short-term stability of long slopes in saturated clay.
Limitations. Total-stress analysis: valid for rapid loading only.
Source. Taylor 1948 [55] [18] · In the manual: Ch 6.3 §6.3.2
Variables. W = slice weight (lb/ft); α = inclination of the slice base (degrees); ℓ = length of the slice base = b / cos α (ft); u = pore pressure at the slice base (psf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| W | slice weight (lb/ft) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| α | inclination of the slice base (degrees) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| ℓ | length of the slice base | Another equation | Computed: ℓ = b / cos α (ft) | project-specific |
| u | pore pressure at the slice base (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
Use. Hand checks of circular surfaces.
Limitations. Ignores interslice forces; with high pore pressure it can be 10–60% conservative compared with Bishop. Use only as a check.
Source. Fellenius 1936 [20] [18] · In the manual: Ch 6.3 §6.3.3
Variables. b = slice width (ft); other symbols as in SL-04. Solve by iteration (FS appears on both sides)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| b | slice width (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
Use. Circular slip surfaces; the standard method for embankments and cuts in soil.
Limitations. Satisfies moment but not horizontal force equilibrium; not for non-circular surfaces. Watch for mα < about 0.2 at the toe, which inflates FS.
Source. Bishop 1955 [7] [18] · In the manual: Ch 6.3 Eq. 6.3-1, Ch 6.3 Eq. 6.3-2
Variables. d = maximum depth of the slip surface below the chord from crest to toe (ft); L = chord length (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| d | maximum depth of the slip surface below the chord from crest to toe (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| L | chord length (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
Use. Non-circular (composite or planar) surfaces through weak layers.
Limitations. Force equilibrium only; f0 is an approximate correction for interslice shear. Prefer Spencer or Morgenstern–Price in software for final design.
Source. Janbu 1973 [29] [18] · In the manual: Ch 6.3 Eq. 6.3-5, Ch 6.3 Eq. 6.3-7
Variables. h = slice height (ft); m, n = stability coefficients from Bishop–Morgenstern charts
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| h | slice height (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. Simple representation of pore pressure in homogeneous embankments and chart solutions.
Limitations. A single ru cannot represent perched water or artesian pressure; use a piezometric surface for those.
Source. Bishop & Morgenstern 1960 [8] · In the manual: Ch 6.3 Eq. 6.3-4
Variables. Ns = stability number from Taylor's chart, a function of slope angle and depth factor D = (depth to firm base)/H (5.52 for deep base failure, β < 53°); H = slope height (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Ns | stability number from Taylor's chart, a function of slope angle and depth factor D | Another equation | Computed: N_s = (depth to firm base)/H (5.52 for deep base failure, β < 53°) | project-specific |
| H | slope height (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| su | undrained shear strength | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
Use. Quick undrained checks of homogeneous clay slopes and embankment foundations.
Limitations. Homogeneous su, no water in cracks, no surcharge. Use software for layered sections.
Source. Taylor 1937 [54] · In the manual: Ch 6.3 Eq. 6.3-14
Variables. Ka = tan2(45° − φ'/2); zw = depth of water in the crack (ft); Pw in lb/ft
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Ka | intermediate value computed on this page | Another equation | Computed: K_a = tan^2(45° − φ'/2) | project-specific |
| zw | depth of water in the crack (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
| su | undrained shear strength | Lab or field test | Lab: UU triaxial (ASTM D2850) or unconfined compression (D2166). Field: vane shear (D2573), CPT su = (qt − σv)/Nkt, or pocket penetrometer/Torvane for screening. | soft 250–500, stiff 1,000–2,000 psf · by USCS group |
Use. Crest of cuts and embankments in cohesive soils; analysis with the crack assumed water-filled.
Limitations. Truncate the slip surface at the crack; do not count strength across the crack.
Source. Terzaghi 1943 [57] [18] · In the manual: Ch 6.3 Eq. 6.3-8, Ch 6.3 Eq. 6.3-9
Variables. kh = horizontal seismic coefficient (fraction of g; often 0.5 PGA); W = weight of the sliding mass (lb/ft); u = pore pressure on the slip surface (psf)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| kh | horizontal seismic coefficient (fraction of g | Field or lab test | Field: pumping test, slug test (ASTM D4044, withdrawn 2024) or packer test. Lab: constant head (D2434) for sands, flexible-wall (D5084) for clays. Hazen k ≈ C·D102 for clean sands only. | clean sand 1–100, clay < 0.001 ft/day · by USCS group |
| W | weight of the sliding mass (lb/ft) | Another equation | Area of the slice, wedge or wall section from the cross-section geometry × unit weight γ (from lab tests). | project-specific |
| u | pore pressure on the slip surface (psf) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
| φ' | effective friction angle | Lab test (or correlation) | Triaxial CU with pore pressure (ASTM D4767) or CD (D7181), or direct shear (D3080). Sands are rarely sampled: estimate from SPT or CPT correlations (IS-04, IS-05, IS-08). | sands 30–42°, clays 17–32° · by USCS group |
| c' | effective cohesion | Lab test | Effective cohesion intercept from the same triaxial or direct-shear tests used for φ'. Take c' = 0 for sands and for long-term design unless tests justify more. | 0–300 psf · by USCS group |
| γ | total (moist) unit weight | Lab test | Weigh and measure undisturbed tube samples (ASTM D7263); for fill, use the compaction spec. Or compute γ = γd(1 + w). | sands 105–135, clays 95–130 pcf · by USCS group |
Use. Screening of slopes and embankments for earthquake loading.
Limitations. Treats a transient load as permanent; a FS below 1.0 means displacement, not necessarily failure. Follow with a Newmark estimate (DY-06). Not valid where strength loss or liquefaction is possible.
Source. Terzaghi 1950; Kramer 1996 [32] · In the manual: Ch 6.3 Eq. 6.3-10, Ch 6.3 Eq. 6.3-11
Variables. cj, φj = joint cohesion (psf) and friction angle; A = length of the sliding plane per foot of slope (ft2/ft); W = block weight (lb/ft); ψp = dip of the sliding plane; U = uplift on the plane; V = water force in the tension crack; zw = water depth in the crack (ft)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| A | length of the sliding plane per foot of slope (ft^2/ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| W | block weight (lb/ft) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| ψp | dip of the sliding plane | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| U | uplift on the plane | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| V | water force in the tension crack | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| zw | water depth in the crack (ft) | Field measurement | Groundwater level from boring logs, observation wells or piezometers (ASTM D5092 / D4750); design with the seasonal high level. | project-specific |
Use. Rock cuts where a discontinuity dips out of the face at less than the face angle and more than φj, within about ±20° of the face strike.
Limitations. Assumes a triangular uplift distribution and a single plane. Check wedges and toppling separately; use measured joint orientation, not one value.
Source. Hoek & Bray 1981 [26] [65] · In the manual: Ch 6.3 Eq. 6.3-13
Variables. c′R = apparent root cohesion (grasses and shrubs about 40–125 psf; trees 65–210 psf); d = slip depth within the root zone
Use. Shallow slides on vegetated slopes; sensitivity to loss of cover.
Limitations. Most roots are within about 2 in. of the surface, tree roots to about 10 ft; check FS with c′R = 0.
Source. Nowak 2012 (Table 70.7), after Norris et al. 2008 [70] · In the manual: Ch 6.3 §6.3.18
Variables. ua − uw = matric suction; φb = friction angle for suction (tanφb = Se tanφ′ in the Bishop form)
Use. Strength of fill and slopes above the water table.
Limitations. Suction is weather-dependent; never rely on it for design of a slope steeper than φ′.
Source. Fredlund, Morgenstern and Widger 1978 [77] · In the manual: Ch 6.4 §6.4.12