F.9 Subgrade, Frost and Reinforcement

The closed-form equations of soil and rock mechanics used in this manual, 97 entries in nine families, each with its variables, the conditions it assumes, its source and the sections that use it. English units throughout.
Author: Daniel P. Colwell
F.9 Subgrade, Frost and Reinforcement

Plate and deflectometer moduli, frost penetration, geosynthetic membranes and stone-column load sharing.

SG-01Elastic modulus from a plate or LWD testE
E = f · (1 − ν2) · σ0 · a / d0

Variables. σ0 = applied plate pressure (psi); a = plate radius (in.); d0 = center deflection (in.); f = 2 for a flexible plate (uniform pressure), π/2 for a rigid plate; E in psi

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
σ0applied plate pressure (psi)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
aplate radius (in.)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
d0center deflection (in.)Field or lab measurementRecorded during the test or monitoring (readings, times, dimensions of the test setup).project-specific
f2 for a flexible plate (uniform pressure), π/2 for a rigid plateChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Plate load tests and light weight deflectometer tests on subgrade and subballast.

Limitations. Composite modulus over about 1–1.5 plate diameters; it is stress-dependent, so report the stress level with the value.

Source. Timoshenko & Goodier 1951; ASTM E2583 [61] · In the manual: Ch 2.3 §2.3.6, Ch 7.3 §7.3.2

SG-02Frost penetration depth (Stefan, modified Berggren)X
X = λ · √( 48 k · F / L )    L = 144 · w · γd

Variables. X = frost depth (ft); k = thermal conductivity (BTU/hr·ft·°F; frozen-soil value, or the average of frozen and unfrozen values as in TM 5-852-6); F = surface freezing index = n × air freezing index (°F-days); L = volumetric latent heat (BTU/ft3); w = water content (decimal); γd = dry unit weight (pcf); λ = Aldrich–Paynter correction coefficient (≤ 1; λ = 1 gives the Stefan equation)

Inputs: where each value comes from (8)
SymbolWhat it isComes fromHow to get itTypical range
Xfrost depth (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
kthermal conductivity (BTU/hr·ft·°FPublished dataKersten charts in UFC 3-130-06 (TM 5-852-6) for the measured γd and w.fine-grained 0.8–1.4 BTU/hr·ft·°F · by USCS group
Fsurface freezing index = n × air freezing index (°F-days)Published hazard / climate dataDesign freezing index from NOAA climate records per UFC 3-130-06 (average of the 3 coldest winters in 30 years).project-specific
Lvolumetric latent heat (BTU/ft^3)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
wwater content (decimal)Lab testOven-dry water content of samples (ASTM D2216); field check by microwave (D4643) or nuclear gauge (D6938).gravels/sands 3–25%, clays 15–70% · by USCS group
γddry unit weight (pcf)Lab or field testLab: ASTM D7263 on tube samples. Field: nuclear gauge (ASTM D6938), sand cone (D1556) or drive cylinder (D2937). Or γd = γ/(1 + w).sands 90–125, clays 80–115 pcf · by USCS group
λAldrich–Paynter correction coefficient (≤ 1Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific
λ1 gives the Stefan equation)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Frost depth for track subgrade protection and yard pavements.

Limitations. Stefan (λ = 1) over-predicts depth; the 48 converts °F-days to °F-hours (× 24) with the factor 2 of the derivation. Use the design freezing index of the coldest year in 10 or 30, not the mean.

Source. Stefan 1891; Aldrich & Paynter 1953 [3] [62] · In the manual: Ch 7.3 §7.3.5, Ch 2.3 §2.11

SG-03Geosynthetic spanning a gap (parabolic membrane)T
Th = wT · s2 / (8 y)    Tmax = Th · √(1 + (4y/s)2)
ε ≈ 8y2 / (3s2)

Variables. wT = vertical load on the reinforcement (psf, i.e. lb/ft per ft width); s = clear span between supports (ft); y = sag at mid-span (ft); ε = average strain; T in lb/ft

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
wTvertical load on the reinforcement (psf, i.eProject geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
sclear span between supports (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
ysag at mid-span (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
εaverage strainChart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.project-specific

Use. Load transfer platforms over column caps, voids and sinkholes.

Limitations. Solve T and y together with the reinforcement's stiffness (T = J · ε) so that the strain is compatible; use the long-term creep-reduced strength.

Source. Parabolic cable theory; BS 8006-1:2010 [4] · In the manual: Ch 7.2 §7.2.8

SG-04Stone columns: area ratio and stress concentrationas, n
as = (π/4)(D/s)2 (square)    as = (π / 2√3)(D/s)2 (triangular)
σc = σ / [1 + (n − 1) as]    σs = n σ / [1 + (n − 1) as]    Streated / Suntreated ≈ 1 / [1 + (n − 1) as]
qult ≈ as · qult,col + (1 − as) · qult,soil

Variables. D = column diameter (ft); s = column spacing (ft); σ = average applied stress (psf); σc, σs = stress on clay and on the column; n = stress concentration ratio σs/σc (typically 2–5)

Inputs: where each value comes from (4)
SymbolWhat it isComes fromHow to get itTypical range
Dcolumn diameter (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
scolumn spacing (ft)Project geometryFrom project plans, survey and the design layout; layer depths and thicknesses from the boring logs.project-specific
σaverage applied stress (psf)Loading criteriaFrom the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications.project-specific
nstress concentration ratio σ_s/σ_c (typically 2–5)Chart, table or correction factorRead from the cited chart or table for the site conditions; values listed in the definition.typically 2–5

Use. Settlement reduction and bearing improvement with stone columns or aggregate piers.

Limitations. Equilibrium identities; n is chosen from experience or load tests. Not for very soft clay (su < about 300 psf) where columns bulge.

Source. Barksdale & Bachus 1983 [5] · In the manual: Ch 7.2 §7.2.4