The rail as a beam on an elastic (Winkler) foundation, and the steps from wheel load to rail seat load, tie–ballast pressure and subgrade stress.
Variables. p = distributed support reaction under the rail (lb/in.); y = rail deflection (in.); u = track modulus (psi)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| p | distributed support reaction under the rail (lb/in.) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| y | rail deflection (in.) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
| u | track modulus (psi) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
Use. Continuous support of one rail by ties, ballast, subballast and subgrade together. Typical values: about 2,000–7,000 psi for mainline track.
Limitations. u lumps all layers below the rail into one spring and is not a soil property. It varies with load level and season; back-calculate it from deflection at representative loads (TR-05).
Source. Winkler 1867; Talbot (AREA) 1918 [64] [25] [50] · In the manual: Ch 2.3 §2.3.6
Variables. E = rail modulus = 30 × 106 psi; I = rail moment of inertia (in.4; 136RE ≈ 95 in.4); u = track modulus (psi)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| E | rail modulus | Another equation | Computed: E = 30 × 10^6 psi | project-specific |
| I | rail moment of inertia (in.^4 | Material property (published) | Code or manufacturer value: steel E = 29,000,000 psi; concrete per ACI 318; rail and pile section properties from AREMA or producer tables. | project-specific |
| u | track modulus (psi) | Another equation | From unit weights, layer thicknesses and the groundwater level: σv = Σγihi, u = γw × depth below the water table, σ' = σ − u. Use the design groundwater level. | project-specific |
Use. Sets how far a wheel load spreads along the rail; wheels within about 3Lc to 4Lc of each other interact.
Limitations. Beam on elastic foundation: ignores rail–tie gaps, voided ties and tie spacing. Results become poor where hanging ties or poor support are present.
Source. Hetényi 1946 [25] [50] · In the manual: Ch 2.3 §2.3.6
Variables. P = wheel load (lb); x = distance from the wheel (in.); y in in.; M in in.-lb. Zero moment at x = π/(4β); uplift begins at x = 3π/(4β)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| P | wheel load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| x | distance from the wheel (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Single or multiple wheel loads on continuously supported rail; rail bending stress = M · c / I.
Limitations. Use the dynamic wheel load (TR-08) for design. Superposition is valid only within the linear range; the model does not represent ballast settlement or lift-off of unloaded ties.
Source. Hetényi 1946 [25] [50] · In the manual: Ch 2.3 §2.3.6, Ch 2.3 §2.11
Variables. P = single applied wheel load (lb); y0 = measured rail deflection under that load (in.); E I as in TR-02
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| P | single applied wheel load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| y0 | measured rail deflection under that load (in.) | Field or lab measurement | Recorded during the test or monitoring (readings, times, dimensions of the test setup). | project-specific |
Use. Back-calculating u from a single-load test (loaded car or test vehicle) with the seating deflection subtracted.
Limitations. Take y0 as the deflection between two load levels (for example, a light seating load and the test load) so that voids under ties do not inflate it. Neighboring axles must be far enough away (> 4Lc) or included by superposition.
Source. Rearrangement of TR-03 [50] [34] · In the manual: Ch 2.3 §2.3.6
Variables. a = tie spacing (in.); b = tie width (in.); ℓ = tie length (in.); A'b = effective tie bearing area, taken as the two tamped end thirds of the tie; the factor 2 is the load from both rail seats; qr in lb, pa in psi
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| a | tie spacing (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| b | tie width (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| ℓ | tie length (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| A'b | effective tie bearing area, taken as the two tamped end thirds of the tie | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Ballast pressure check and the starting pressure for spreading load down to subgrade.
Limitations. Assumes uniform pressure over the tamped zones. AREMA limits average tie–ballast pressure to about 65 psi for timber ties and 85 psi for concrete ties; confirm against the edition in use. Center-bound or end-bound ties concentrate pressure well above the average.
Source. Talbot (AREA); AREMA MRE Ch. 1 and 30 [1] [50] · In the manual: Ch 2.3 §2.3.2
Variables. Pd = dynamic wheel load (lb); Bt, Lt = tie width and length (ft); d = ballast plus subballast thickness (ft); θ = spread angle (35° in the manual); σs in psf
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Pd | dynamic wheel load (lb) | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| d | ballast plus subballast thickness (ft) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
| θ | spread angle (35° in the manual) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
Use. First-order subgrade stress for comparing section thicknesses.
Limitations. Approximate: it ignores load sharing between ties and stiffness contrast between layers. Check against ST-04 superposition or a layered elastic analysis for heavy-axle or soft-subgrade sites.
Source. AREMA MRE Ch. 1 [1] · In the manual: Ch 2.3 §2.3.2
Variables. Ps = static wheel load (lb; Cooper E-80 = 40,000 lb per wheel); V = train speed (mph); D = wheel diameter (in.)
| Symbol | What it is | Comes from | How to get it | Typical range |
|---|---|---|---|---|
| Ps | static wheel load (lb | Loading criteria | From the loading criteria: AREMA MRE (Cooper E-80, impact), structural loads from the designer, or equipment specifications. | project-specific |
| V | train speed (mph) | Chart, table or correction factor | Read from the cited chart or table for the site conditions; values listed in the definition. | project-specific |
| D | wheel diameter (in.) | Project geometry | From project plans, survey and the design layout; layer depths and thicknesses from the boring logs. | project-specific |
Use. Converts static wheel load to a design dynamic load; the manual's DLF of 1.2 to 1.5 brackets typical results.
Limitations. Semi-empirical (derived from field measurements, not mechanics). It does not cover wheel flats, rail joints or bridge-approach stiffness transitions, which can raise loads well above this value.
Source. Talbot; AREMA MRE Ch. 1 and 30 [1] · In the manual: Ch 2.3 §2.3.2, Ch 6.1 §6.1.4