GHRMCalculators About this app

Plan Set PDF → KMZ

Set up the conversion

Choose the plan set, which KMZ conversions you want, and the PDF pages to work on. The app then reviews each sheet, finds what it can (sheet type, stations, coordinates, datum, scales, profile and section grids) and asks you for anything it still needs.

1. Plan set PDF

Drop the plan set PDF here
or click to choose a file

3. PDF page range

Limit the range to the plan, profile and cross section sheets to speed things up.

2. KMZ conversions requested

Profiles and cross sections need an alignment. You can digitize it on a georeferenced plan sheet or paste station/coordinate rows.

Choose a PDF to begin.

Sheet review

Check the sheet types the app detected. Untick any sheet you don't want converted, or change its type. Then confirm the project information below.

Reviewing…

Project information

Used to convert sheet Northing/Easting values to latitude/longitude. If the plans have no coordinates, pick control points on the map instead and this can stay as is.

Select a sheet.
Mouse wheel zooms, right-drag (or the Pan tool) moves the sheet. Every item in Still needed opens the sheet and tool that fixes it.

Build KMZ files

Building…

Downloads

Files appear here when the build finishes.

Open a KMZ in Google Earth Pro. Profiles and cross sections are 3D models; turn on 3D view and tilt the view to see them. If a curtain sits below the terrain, rebuild with the “bottom on terrain” placement or an elevation offset.

Footprint check

Green: plan overlays · Blue: profiles · Orange: cross sections · Red: alignment.

Build log