On many northern and mountain lines the largest floods, washouts and spring slope failures come from snowmelt, often with rain falling on the snow. The USACE manual Runoff from Snowmelt (EM 1110-2-1406) describes how snowmelt is measured, computed and turned into runoff.
Eq. 3.5-8: Ms = Cm (Ta − Tb), where Ms = melt (in./day), Ta = air temperature (°F), Tb = base temperature (usually 32°F) and Cm = melt-rate factor. Cm is typically 0.04 to 0.08 in./°F-day for rain-free conditions and higher during rain on snow with wind; calibrate it for the basin, because it changes through the season with snow albedo and sun angle.
During rain on snow the sky is overcast and the air saturated, and condensation of warm moist air on the snow, driven by wind, supplies most of the melt; the rain itself adds relatively little heat. The generalized equations (EM 1110-2-1406, Eqs. 5-19 and 5-20) give daily melt M (in./day):
Eq. 3.5-9 (open to partly forested, 10 to 80% canopy): M = (0.029 + 0.0084 k v + 0.007 Pr)(Ta − 32) + 0.09
Eq. 3.5-10 (heavily forested, over 80% canopy): M = (0.074 + 0.007 Pr)(Ta − 32) + 0.05
where k = basin wind exposure coefficient (1.0 for open plains, as low as 0.3 in forest), v = wind speed (mph, at 50 ft), Pr = rainfall (in./day) and Ta = temperature of the saturated air (°F, at 10 ft). The total water input to the ground is melt plus rain.
A Class I railroad located in Montana has a culvert draining a 1.5-mi² partly forested basin. A warm Pacific storm is forecast to bring 2.0 in. of rain in 24 hours at about 45°F with 15-mph wind, onto a ripe snowpack holding more than 6 in. of SWE over frozen ground. The engineer must estimate the water reaching the culvert, to judge whether a slow order and culvert watch are needed.
| Variable | Value | Description |
|---|---|---|
| A | 1.5 mi² | Drainage area, partly forested |
| k | 0.6 | Basin wind exposure coefficient |
| v | 15 mph | Wind speed |
| Ta | 45°F | Air temperature, saturated |
| Pr | 2.0 in./day | Rainfall |
| Runoff | 100% of water input | Ripe snowpack over frozen ground (assumption) |
Melt adds about 1.6 in. to the 2.0 in. of rain, for about 3.6 in. of water in a day and a mean flow near 146 cfs, about 1.8 times the flow from rain alone.
The peak flow will be well above the 146-cfs daily mean, because the rain and melt are not uniform through the day. If the culvert was sized for rainfall alone, it may be overtopped or held at a high headwater, and snow and ice at the inlet can reduce its capacity further. Before the storm, clear the inlet and outlet of snow and ice, check the culvert’s rating for this flow, arrange a culvert watch, and set a slow order trigger through the live rating (Section 3.8.26). Calibrate the melt equation with past rain-on-snow events where gauge or SNOTEL data exist.
For railroad work: In snow country, include snowmelt and rain on snow in the hydrology for culverts, bridges and slopes, not only rainfall. Track SWE from nearby SNOTEL sites and forecast warm rain events through the live rating. Expect high runoff where the ground is frozen, and clear culvert inlets of snow and ice before thaws. Spring break-up hazards are covered in Chapter 3.8.
Sources: USACE (1998), Runoff from Snowmelt, EM 1110-2-1406, Chs. 2–6 (temperature index Eq. 6-1; rain-on-snow Eqs. 5-19 and 5-20; Table 5-1 forest classes). Official page ↗ NRCS SNOTEL network. Official page ↗ Summarized and paraphrased.