3.5.0 Purpose and Overview

Describing the physical setting of a site (ground, water, structures and track) so that everyone working on it starts from the same picture.
Author: Daniel P. Colwell
3.5.0 Purpose and Overview

The site conditions section is the bridge between the data and the recommendations. It tells a reader who has never been to the site what is there: the land and its history, the ground and the water, the structures and utilities, and the track and its traffic. It appears in the proposal (as expected conditions), in the reconnaissance report (as observed conditions) and in the final report (as conditions confirmed by the borings).

Table 3.5-1. Where site conditions come from at each stage
StageMain sourcesHow it is written
ProposalDesktop study: maps, legacy borings, soil survey, history (Chapter 3.2)Anticipated conditions, by area or reach, with the design concern for each
ReconnaissanceWalk-over, photographs, lidar (Chapter 3.4)Observed surface conditions and access
ReportBorings, laboratory tests, groundwater readingsSubsurface profile confirmed; differences from expected conditions noted