3.5.5 Existing Structures and Utilities

Describing the physical setting of a site (ground, water, structures and track) so that everyone working on it starts from the same picture.
Author: Daniel P. Colwell
3.5.5 Existing Structures and Utilities

List the structures and utilities that the work must avoid or that the design must account for: bridges and culverts (type, size, material, condition), retaining walls, signal masts and cabinets, buried cables and conduits, sewers and storm drains, overhead power. Take them from the railroad valuation maps and confirm them in the field.

Table 3.5-4. Structures and utilities to record
ItemRecord
CulvertsLocation (station), size, material, length, inlet and outlet condition, flow
Bridges and wallsLocation, type, foundation if known, condition
Signals and communicationsMasts, cabinets, foundations, conduits at grade; keep borings clear
Sewers and storm drainsSize and location from valuation maps and city atlases; relation to ditches and odors
Overhead linesClearance for the drill mast
A concrete headwall and drainage structure beside the track, with a fence line behind. Structures like this one set both a boring offset and the limits of the rig route.
Figure 3.5-4. A concrete headwall and drainage structure beside the track, with a fence line behind. Structures like this one set both a boring offset and the limits of the rig route.