Water is the most common trigger of track failure, and the culverts through an embankment set how much water it holds back. The site-conditions review should therefore establish the drainage area of each crossing, a design flow, and whether the existing opening is adequate. AREMA Chapter 1, Parts 3 and 4, give the rational method for small basins and the culvert design criteria; railroad culvert guidelines add a 100-year design storm, E80 loading, and a 36 in. minimum pipe.
Equation 3.5-1. Peak flow and time of concentration
Q in cfs, i in in./hr for a duration equal to tc, A in acres; tc in minutes, L in ft, S in ft/ft. Use the rational method with caution above about 300 acres (Kirpich is intended for agricultural basins under 200 acres).
| Vegetation and slope | Open sandy loam | Clay and silt loam | Tight clay |
|---|---|---|---|
| Woodland: flat / rolling / hilly | 0.10 / 0.25 / 0.30 | 0.30 / 0.35 / 0.50 | 0.40 / 0.50 / 0.60 |
| Pasture: flat / rolling / hilly | 0.10 / 0.16 / 0.22 | 0.30 / 0.36 / 0.42 | 0.40 / 0.55 / 0.60 |
| Cultivated: flat / rolling / hilly | 0.30 / 0.40 / 0.52 | 0.50 / 0.60 / 0.72 | 0.60 / 0.70 / 0.82 |
Flat 0 to 5%, rolling 5 to 10%, hilly 10 to 30% slope. Urban values are in AREMA Table 1-3-2; a railroad yard is 0.20 to 0.35.
| Flood | Criterion |
|---|---|
| 25-year | Discharged without static head at the entrance (HW/D ≤ 1.0) |
| 100-year | Headwater no higher than the available head, 2 ft below base of rail, or 1.5 times the diameter, whichever is least |
The calculator computes inlet-control headwater with the FHWA HDS-5 equations that underlie the charts AREMA cites. Outlet control (barrel friction and tailwater) should also be checked for long or flat culverts.
| Result | Value |
|---|---|
| Time of concentration (Kirpich) | 18.7 min |
| Q25 / Q100 | 86 cfs / 112 cfs |
| 60 in. corrugated metal pipe with headwall: HW/D at Q25 | 0.76 |
| Headwater at Q100 (limit 7.5 ft) | 4.5 ft |
| Adequate (inlet control) | yes |
Rainfall intensities are illustrative; read them from the local intensity-duration-frequency curve at tc.
Open the culvert hydrology calculator →
Rational-method peak flows with Kirpich or Kerby time of concentration, and inlet-control headwater checked against the AREMA criteria.
These documents are in the reference library. The summaries above are paraphrased; equations and tabulated limits are standard or published values. Individual railroads are not named.
The rational method in this section suits small basins. For larger or mixed-use basins, and wherever the runoff volume or the shape of the flood matters, the NRCS (formerly SCS) methods are used.
S = 1000 / CN − 10 Ia = 0.2 S Q = (P − Ia)2 / (P − Ia + S) for P > Ia
For railroad work: Use the curve number method where a culvert or bridge drains more than a few hundred acres, where the basin is urbanizing (raise CN for future development, since railroad culverts outlast the land use around them), or where water ponds against the embankment and the volume matters for seepage and stability during the flood (Chapter 2.8, Chapter 6.3). A change in CN upstream is one of the triggers worth recording in the desktop study and the live rating (Chapter 3.8).
Source: Goswami, I. (2015). Civil Engineering All-In-One PE Exam Guide: Breadth and Depth, 3rd ed. New York: McGraw-Hill Education, Chapter 304, Hydrology.
Larger basins, ponding and snowmelt: flood hydrographs, routing behind embankments and flood frequency are in Section 3.5.12; snowmelt and rain on snow in Section 3.5.13.