Report groundwater as measured (at drilling, completion and 24 hours, with dates), and say what it means: depth below grade, relation to nearby lakes, rivers and ditches, perched water over clay or rock, and seasonal change. Describe surface water features (streams, ditches, swales, ponds) with their flow, condition and any odor or staining.
| Write | Avoid |
|---|---|
| "Groundwater was measured at 4 ft below grade at completion of HA-14 on [date]." | "Groundwater is at 4 ft." (a single reading is not a design level) |
| "Ground surface is 5 to 13 ft above the lake; groundwater is expected within a few feet of the surface." | Leaving out the reason groundwater is high |
| "Water levels in nearby wells are 145 to 200 ft deep and variable, typical of karst aquifers; perched water may occur over rock." | Treating deep regional water as the design level for a fill on clay |