3.5.7 Environmental and Property Constraints

Describing the physical setting of a site (ground, water, structures and track) so that everyone working on it starts from the same picture.
Author: Daniel P. Colwell
3.5.7 Environmental and Property Constraints
Table 3.5-5. Environmental and property constraints
ConstraintTypical sourcesEffect
WetlandsNational Wetlands Inventory; delineation if neededBoring offsets; clearing method; possible permit
Flood zoneFEMA flood mapsFloodplain permit for fill; seasonal access
Protected species and nesting birdsIPaC report; migratory bird windowsClearing outside the local migratory bird nesting season (the dates vary by region; the U.S. Fish and Wildlife Service field office gives them), or a nest check
Contaminated or regulated sitesState and federal databases; radius reportScreening, drummed cuttings, extra tests (pH, sulfate, chloride, resistivity)
Property lines and right-of-wayCounty parcels; railroad valuation mapsRight-of-entry; public-way permits for borings outside the railroad parcel