Close with a short summary that a reader could use on its own, in the order of this chapter, and a line on each condition that controls design. Keep observed, expected and concluded statements separate.
Template. The site is [location and use]. Ground is at El. [range] ft, [landform]. The geology is [regional summary]; the borings encountered [profile]. Groundwater was measured at [depths, dates]. Surface water: [features]. Structures and utilities: [list]. The track is [main/siding, traffic]. Constraints: [wetlands, flood zone, species, contamination, property]. The conditions that control design are [two or three items].