3.10.8 Cross-References

Abandoned mines, buried structures, utilities and old works: hazards that people put in the ground, and how to find them before they find the project.
Author: Daniel P. Colwell
3.10.8 Cross-References

Related chapters in this manual:

Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 3.10.1-1 — Profile view of site remediated using Bulk Infill Grouting. From Ryan (1983), courtesy of GeoCon®. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  2. Photo 3.10.1-2 — Excavation during an abandoned underground mine subsidence remediation, Jackson County State Route 32. From Ohio Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  3. Photo 3.10.1-3 — Replacement (backfilling) during an abandoned underground mine subsidence remediation, Jackson County State Route 32. From Ohio Department of Transportation. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.