Mining and man-made hazards feed the same 1-to-5 rating used for natural hazards (Chapter 3.8). For mining, frequency is driven by cover ratio and evidence of past subsidence; severity by the size of possible pits and the track's speed and traffic. Buried timber and abandoned culverts rate high when the embankment shows settlement, sinkholes or seepage.