3.10.4 Utilities and Pipelines

Abandoned mines, buried structures, utilities and old works: hazards that people put in the ground, and how to find them before they find the project.
Author: Daniel P. Colwell
3.10.4 Utilities and Pipelines

Utilities cross railroad corridors frequently and lie along many of them: fiber optic cable, signal and communication lines, power, water and sewer, and oil and gas pipelines. They are both a hazard to the work (strikes during drilling) and a potential trigger (leaking water and sewer lines wash out embankments; a pipeline failure is a severe consequence).

  • Call the one-call center before any drilling, and also request railroad signal and communication locates, which may not be covered by one-call.
  • Clear the top 5 to 10 ft of every boring by hand or vacuum excavation where utilities are possible.
  • Keep explorations outside pipeline easements unless the operator approves and attends.
  • Record utility locations in the KMZ and on the boring location plan.

Drilling scope and safety are described in Chapter 3.3; pipeline crossings have an analysis app in Section 6.0.