| Type | Mining method | Surface effect | Timing |
|---|---|---|---|
| Sinkhole (pit) subsidence | Room-and-pillar at shallow depth | Abrupt pit, typically 5 to 40 ft across, from roof collapse migrating up (chimneying) | Decades after mining; often triggered by water |
| Trough (sag) subsidence | Room-and-pillar pillar failure; longwall | Broad, shallow basin; tension cracks at edges, compression at center | Longwall: during and within months of mining; pillar failure: any time |
| Shaft and adit collapse | Any | Pit at the old opening | Any time; often hidden by fill |
| Surface mine highwall and spoil | Strip and open-pit | Settlement of spoil; instability of old highwalls | Spoil settles for decades |



Chimneying (void migration) stops when the collapsed debris, which occupies more volume than the intact rock (bulking), fills the void. A simple estimate of the maximum height of migration is:
A widely used screening rule is that sinkhole subsidence is possible where the cover over room-and-pillar workings is less than about 10 times the mined height, and unlikely where it exceeds about 20 times, unless the overburden is weak or water is involved. These ratios are guides for screening, not design values.