3.10.5 Other Man-Made Hazards

Abandoned mines, buried structures, utilities and old works: hazards that people put in the ground, and how to find them before they find the project.
Author: Daniel P. Colwell
3.10.5 Other Man-Made Hazards
Table 3.10-2. Other man-made hazards
HazardWhere foundConcern
Quarries and pitsBeside lines that hauled aggregateSteep faces, backfilled pits with loose fill, dewatering that triggers karst collapse
Landfills and dumpsLow ground near townsSettlement, gas, leachate, debris
Wells (oil, gas, water, brine)Oil fields, salt and potash areasAbandoned well casings; brine dissolution of salt (Chapter 2.11)
Dredge and hydraulic fillsWaterfronts, port areasLoose, liquefiable sands; soft clays
Dams and leveesFloodplainsSeepage, failure flooding consequence
Contaminated groundFueling sites, yards, industrySee Chapter 5.4