↑ Parent Menu⌂ Main Menu
← Railway Ground Hazard Risk Management
GHRM
Railway Ground Hazard Risk Management · 2.0 · The Underworld
Sections · open a dropdown to go to a section or subsection

Chapter 2.11 — Soluble Ground and Karst: Sinkholes, Voids and Dissolution

Limestone, dolomite, gypsum and salt dissolve. The voids they leave, and the soil that ravels into them, cause some of the most sudden failures under track.
Author: Daniel P. Colwell

Soluble rocks underlie a large share of the eastern and central United States, and gypsum and salt are common in the plains and the Southwest. Dissolution opens voids in the rock and the soil above ravels down into them, forming cover-collapse sinkholes that can appear in hours with little warning. This chapter describes the sinkhole types, how to find karst features, why borings alone rarely find them, how to rate the risk, and how to treat them under track.

Further reading — ICE Manual of Geotechnical Engineering
The chapters below cover the same ground in more depth. They are cited, not reproduced; see Appendix G for the full cross-reference and edition notes.
2.11.0 Purpose and Overview

Karst is the landscape that forms on soluble rock. Its features include sinkholes, sinking streams, springs, caves, pinnacled rock surfaces and soil-filled slots. For railroads, karst matters because it causes sudden, local loss of support under track, often after a change in water: a new culvert outfall, a broken water main, a ditch that now discharges into a sinkhole, drawdown from a quarry or well field, or an intense storm.

The governing difficulty is that karst features are small compared with the spacing of any practical boring program, and the rock surface can vary by tens of feet across a few feet horizontally. A site can be explored with a dozen borings that miss every void. The investigation therefore relies on desktop study and geophysics to find anomalies, and on borings to confirm them.

2.11.1 Soluble Rocks
Table 2.11-1. Soluble rocks and rate of dissolution
RockRelative solubilityEngineering significance
Limestone, dolomite, marble (carbonates)Slow; features form over thousands of yearsVoids and sinkholes form mainly by soil raveling into existing openings; rock voids change little in a structure's life
Gypsum and anhydriteRoughly 100 times faster than limestoneNew voids can form within a structure's life where flowing water reaches the rock; anhydrite swells as it hydrates
Rock salt (halite)Very fastRapid subsidence where fresh water reaches salt, often from wells, mines or brine extraction

Gypsum and salt are the dangerous cases because dissolution can be fast enough to matter during the service life of an embankment or bridge. A drainage change that sends fresh water into gypsum-bearing ground should be treated as a potential new trigger.

2.11.2 Sinkhole Types
Table 2.11-2. Sinkhole types
TypeMechanismSpeedRailroad significance
Solution (dissolution)Gradual lowering of the rock surface where water concentratesVery slowShallow depressions; drainage problems
Cover-subsidenceSandy cover gradually ravels into openings, forming a bowlSlow, months to yearsProgressive settlement; detectable by survey
Cover-collapseClayey cover arches over a growing void until the arch failsSudden, minutes to hoursThe main hazard: abrupt loss of support under track
Caprock (bedrock) collapseRoof of a cave collapsesSuddenRare at shallow depth; important for bridges and deep cuts
Buried (filled) sinkholeAn old sinkhole filled with soft soilStatic until loaded or wettedDifferential settlement and soft pockets; often found during construction

Most sinkholes that affect railroads are cover-collapse or cover-subsidence sinkholes induced by concentrated water: the soil is washed down into the rock openings from above (raveling), or a falling water table removes buoyant support from the soil arch. Both are driven by human changes to drainage far more often than by natural processes alone.

2.11.3 Finding Karst: Desktop Study and Reconnaissance
  • State geological survey karst and sinkhole maps, and karst layers in the Earth Viewer.
  • LiDAR bare-earth hillshade and closed-depression analysis: sinkholes stand out as closed contours that no stream drains.
  • Historical aerial photographs: new depressions, ponds that appear and drain, circular vegetation changes.
  • Track maintenance records: repeated surfacing at the same spot, especially after storms, is a classic karst signal.
  • Field reconnaissance: depressions, swallets where ditches disappear, leaning fence posts and poles, cracked ditch linings, springs at the toe of slopes.

These sources are free and fast, and they should be finished before any geophysics or drilling is scoped (Chapter 3.2).

2.11.4 Finding Karst: Geophysics and Drilling

Because the features are small, the chance that a boring grid hits a given void is low. For a circular void of diameter D and a square boring grid of spacing S, with D smaller than S:

P ≈ π D2 / (4 S2)(Eq. 2.11-1)
Approximate probability that a single randomly located void is hit by a boring in the grid.

A 10-ft void under a 50-ft grid has about a 3% chance of being hit. This is why geophysics comes first. Electrical resistivity imaging (ERI) and multichannel analysis of surface waves (MASW) are the most widely used methods for mapping the rock surface and soil-filled zones; microgravity finds air-filled voids; ground-penetrating radar works in sandy cover but not in clay. Borings then target the anomalies and a few control points.

Table 2.11-3. Methods for karst investigation
MethodFindsLimitations
Electrical resistivity imagingRock surface, clay-filled slots, wet raveled zonesResolution falls with depth; needs ground contact
MASW / seismicSoft zones and rock surfaceLower lateral resolution
MicrogravityAir-filled voidsSlow; sensitive to terrain and nearby mass
Ground-penetrating radarShallow voids and raveled zones in sandy coverLittle penetration in clay
Borings with rock coringConfirms rock, voids, infill; loss of circulation and rod drops are key observationsPoint data; low chance of hitting voids
Probe holes (air track)Rapid check of rock surface and voids on a tight gridNo samples

In borings, log rod drops, loss of drilling fluid, soft or very soft soil just above rock and sudden changes in rock depth. These observations are often more valuable than the samples themselves (Chapter 4.1).

2.11.5 Risk Rating

A karst risk rating combines the geology (is the rock soluble, and how deep), evidence of activity (existing sinkholes, maintenance history) and triggers (concentrated water, drawdown).

Table 2.11-4. Suggested karst inputs to the 1-to-5 risk rating (Chapter 3.8)
RatingGeology and evidenceTriggers
1 Very lowNon-soluble rock, or soluble rock under more than 100 ft of coverNone
2 LowSoluble rock mapped; no sinkholes within 1/4 mileNormal drainage
3 ModerateSinkholes mapped within 1/4 mile; pinnacled rock in boringsCulverts or ditches discharging toward karst
4 HighSinkholes within 500 ft; past subsidence at or near the trackConcentrated discharge into ground; nearby pumping or quarrying
5 SevereActive depression or void under track; gypsum or salt with fresh water reaching itOngoing; recent storm or water main break

Karst is a natural candidate for the live risk rating described in Chapter 3.8: rainfall intensity and water levels in nearby wells are measurable triggers that raise the likelihood of collapse for a known susceptible site.

2.11.6 Treatment Under Track
Table 2.11-5. Treatment of sinkholes and karst under track
MethodDescriptionUse
Drainage controlRedirect concentrated water away from karst; line ditches; avoid discharging culverts into sinkholesAlways; often the most effective measure
Inverted filter repairExcavate to rock throat, plug with large stone and concrete, then graded filter and compacted clay capIndividual sinkholes accessible from the surface
Compaction groutingLow-slump grout injected to densify raveled soil and fill voids above rockUnder operating track; limits ground loss
Cap (cavity) groutingFlowable grout injected at the rock surface to seal the throats feeding ravelingLarge areas of pinnacled rock
Geosynthetic bridgingHigh-strength geogrid or geotextile layer under the track to span a future void and give warning by saggingLong lengths where voids cannot all be found
Structural bridgingSlab or short span over a known voidSevere, localized cases
Air percussion rig installing grout pipe on site
Photo 2.11.6-1. Air percussion rig installing grout pipe on site. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout being placed in the hopper of the pump
Photo 2.11.6-2. Grout is placed in the hopper of the pump. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout pump with lines running to grout pipes
Photo 2.11.6-3. A grout pump with lines running to grout pipes. The silty sand material used in the grout mix can be seen in the background. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Paddles in the hopper mixing grout materials
Photo 2.11.6-4. Paddles in the hopper of the grout pump thoroughly mix the grout materials. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
Grout lines running from the pump to the casing, held by a hydraulic jack
Photo 2.11.6-5. Grout lines run from the pump to the casing installed in the ground. The casing is held in place by a hydraulic jack. From the files of Dr. Boulanger, UC Davis.Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.

Grouting methods are described in Chapter 7.2. Grout volumes in karst are notoriously hard to predict; a refusal criterion (pressure and take) and a contingency in the estimate are essential.

2.11.7 Worked Example
The example uses a generic site and is not taken from any client project. It follows the five-part format.
Example 2.11-1: Boring Detection Probability and Grout Quantity in Karst

A siding is to be built over limestone with mapped sinkholes nearby. The first proposal is a 50-ft boring grid. Resistivity later shows a raveled zone 40 ft long and 30 ft wide extending 12 ft above rock, and borings in the zone indicate about 15% voids and very soft soil that will take grout.

Given

VariableValueDescription
D10 ftTypical void (throat) diameter assumed
S50 ft, then 25 ftBoring grid spacings considered
L × B × T40 ft × 30 ft × 12 ftRaveled zone from resistivity and borings
nv0.15Estimated void and very soft fraction to be filled
k1.3Grout waste and travel factor

Required

  • Probability that a single 10-ft void is hit by the 50-ft and 25-ft grids
  • Estimated grout volume for the raveled zone

Equations

  1. Eq. 2.11-1: P ≈ πD2/(4S2) — chance a grid boring hits the void
  2. Eq. 2: V = L B T nv k — grout volume estimate

Steps

Step 1 · 50-ft grid
P = π(10)2 / (4 × 502) = 314 / 10,000
P ≈ 0.031, about 3%
Spot check: The void covers about 79 sq ft of each 2,500 sq ft grid cell: about 3%.
↓
Step 2 · 25-ft grid
P = 314 / (4 × 625) = 314 / 2,500
P ≈ 0.13, about 13%
Spot check: Halving the spacing quadruples the borings and the probability, which is still low.
↓
Step 3 · Grout volume
V = 40 × 30 × 12 × 0.15 × 1.3 = 2,808 cf
V ≈ 2,800 cf ≈ 104 cy
Spot check: 14,400 cf of zone × 0.15 = 2,160 cf; × 1.3 = 2,808 cf; ÷ 27 = 104 cy.
↓
Solution
A 50-ft grid has only about a 3% chance of hitting a single 10-ft void (13% at 25 ft). The raveled zone found by resistivity needs on the order of 100 cy of grout, which should be carried with a contingency.

Solution

A 50-ft grid has only about a 3% chance of hitting a single 10-ft void (13% at 25 ft). The raveled zone found by resistivity needs on the order of 100 cy of grout, which should be carried with a contingency.

Even a tight boring grid is a poor tool for finding karst voids; four times the borings raised the detection chance only from 3% to 13%. Geophysics found the raveled zone, and the borings were then placed where they could confirm it. That sequence (desktop study, geophysics, targeted borings) is the efficient way to investigate karst.

Grout takes in karst routinely exceed estimates because grout follows openings outside the target zone. Specify a refusal criterion, start with primary holes on a wide spacing and close in with secondary and tertiary holes, and carry a contingency of 50 to 100% on grout quantity in the estimate (Chapter 3.7).

2.11.8 Cross-References

Related chapters in this manual:

Related ICE Manual chapters are listed in the Further Reading box at the top of this chapter and in Appendix G.

Photograph credits

The photographs in this chapter come from the Geo Technology Reference library. Each is credited as stated in its source document; they are reproduced for reference and remain the property of the credited owners.

  1. Photo 2.11.6-1 — Air percussion rig installing grout pipe on site. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  2. Photo 2.11.6-2 — Grout is placed in the hopper of the pump. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  3. Photo 2.11.6-3 — A grout pump with lines running to grout pipes. The silty sand material used in the grout mix can be seen in the background. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  4. Photo 2.11.6-4 — Paddles in the hopper of the grout pump thoroughly mix the grout materials. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
  5. Photo 2.11.6-5 — Grout lines run from the pump to the casing installed in the ground. The casing is held in place by a hydraulic jack. From the files of Dr. Boulanger, UC Davis. Source: FHWA / SHRP2 R02, GeoTechTools.org technology photo sheet.
← Previous · 2.0 The Underworld Chapter 2.10 — Non-Engineered Fills: Old Embankments, Waste and Made Ground
Next · 2.0 The Underworld → Chapter 2.12 — Sulfates, Sulfides and Problem Mudrocks