Railway Ground Hazard Risk Management · 5.0 · Testing
Sections · open a dropdown to go to a section or subsection

5.5.4 Connection to the GHRM Live Risk Rating

Designing for the most probable conditions, measuring what actually happens, and having the response ready before the measurements arrive.
Author: Daniel P. Colwell
5.5.4 Connection to the GHRM Live Risk Rating

The live risk rating described with the risk assessment (Chapter 3.8) is an observational method applied to a whole network. Each site has a baseline frequency and severity rating; measured quantities (rainfall, river stage, instrument readings) raise the frequency rating when they cross site thresholds. The TARP for a site is the action half of the same system: when the live rating jumps, the TARP says what happens next. Writing the two together keeps the thresholds consistent.

← Previous · 5.0 Testing Chapter 5.4 — Geo-Environmental Testing on Railroad Corridors
Next · 6.0 Analysis → Chapter 6.1 — Foundation Engineering: Bearing Capacity