| Hazard | Quantity | Instrument |
|---|---|---|
| Embankment on soft ground | Settlement, pore pressure, lateral toe movement | Settlement plates, piezometers, inclinometers |
| Slow-moving landslide | Displacement rate at the slip surface, groundwater level | Inclinometers, ShapeArrays, piezometers, survey prisms |
| Cut slope in rock | Crack opening, rockfall counts | Crackmeters, extensometers, inspection |
| Retaining structure | Wall movement, anchor loads | Survey, tiltmeters, load cells |
| Any hazard under traffic | Track geometry (surface, cross-level, alignment) | Track geometry car, manual measurements |
| Rainfall-triggered hazards | Rainfall intensity and antecedent rainfall, river stage | Rain gauges, stream gauges, forecasts |
Instrumentation types and installation are covered in Chapter 5.3. The measurement should be directly related to the mechanism: for a landslide, displacement at the slip surface and the groundwater level that drives it.