8.2.6 Change Order Form

Handling changes in scope, conditions or schedule after the work has started, without stopping the work or losing the money.
Author: Daniel P. Colwell
8.2.6 Change Order Form

A change order form needs only five parts: a description of the change (by item), the reason, how the cost is to be settled (with a breakdown by item, unit, quantity, unit price and amount), the cost summary of Table 8.2-3, and the effect on time, with signature lines for both parties and a distribution list. Keep the form to one page plus the breakdown.

Table 8.2-5. Change order breakdown (form)
ItemDescriptionUnitQuantityUnit priceAmount
1Train standby beyond assumptionhr
2Additional boring footageft
3Additional mobilizationea
4Engineering and reportinghr
Total this change$