Table 3.6-3. Matching the rig to the ground| Ground or route | Rig | Protection |
|---|
| Paved yard roads, gravel lots, firm shoulders | Truck-mounted | None; watch for ruts in soft gravel |
| Brush, grass, gentle slopes | Track-mounted (rubber tracks) | Clearing of a 12-ft lane |
| Soft, wet ground; phragmites; swale bottoms | Track-mounted or ATV with balloon tires | Timber or composite mats; dry or frozen ground |
| Steep or confined sites | Portable or tripod rig | Hand-carried equipment; limited depth |
| Water tank needed (rotary or coring) | Support truck must reach the rig, or tow the tank | Confirm the support-truck route as well as the rig route |