3.6.2 Railroad Access

Working out how crews and equipment will physically reach each boring, what has to be cleared or protected, and what that costs.
Author: Daniel P. Colwell
3.6.2 Railroad Access
Table 3.6-2. Railroad access requirements
RequirementNotes
Approval of the boring planThe railroad's construction or engineering group approves the revised plan before drilling
Badging and safety trainingEvery person and the driller's crew
Track protectionWherever a route reaches the ballast within the fouling zone; flagging schedules drive the start date
No driving on ballastRigs stay on the right-of-way beside the track; reach the toe without crossing the ballast
Track windows for hi-rail or on-track workArranged through the railroad; usually short
Separate setupsReaches that are miles apart need their own mobilization