Table 3.6-2. Railroad access requirements| Requirement | Notes |
|---|
| Approval of the boring plan | The railroad's construction or engineering group approves the revised plan before drilling |
| Badging and safety training | Every person and the driller's crew |
| Track protection | Wherever a route reaches the ballast within the fouling zone; flagging schedules drive the start date |
| No driving on ballast | Rigs stay on the right-of-way beside the track; reach the toe without crossing the ballast |
| Track windows for hi-rail or on-track work | Arranged through the railroad; usually short |
| Separate setups | Reaches that are miles apart need their own mobilization |